龙态河长山段治理工程设计洪水计算分析

赵群

云南水力发电2026,Vol.42Issue(4):10-14,5.
✕
云南水力发电2026,Vol.42Issue(4):10-14,5.DOI:10.3969/j.issn.1006-3951.2026.04.003

龙态河长山段治理工程设计洪水计算分析

Design Flood Calculation and Analysis of Longtai River Changshan Section Governance Project

赵群1

作者信息

  • 1. 北票市农业农村局,辽宁 北票 122100
  • 折叠

摘要

Abstract

The siltation of some sections of the Longtai River basin is severe,and the aging of some projects in the basin has brought many hidden dangers.It is necessary to carry out governance of the Longtai River basin.The key to the operation of governance projects is the review of design floods.In order to clarify the engineering design standards,design flood calculation and analysis should be carried out to provide design basis for the construction of governance projects.This paper briefly describes the overview of the Longtai River Basin and analyzes several issues in the calculation of design floods,aiming to provide detailed data for the construction of governance projects.

关键词

治理/暴雨/洪水/计算

Key words

government/rainstorm/flood/calculate