滇中引水隧洞穿越活动断裂带加固措施现场测试

杜彦彪

云南水力发电2026,Vol.42Issue(4):46-49,4.
✕
云南水力发电2026,Vol.42Issue(4):46-49,4.DOI:10.3969/j.issn.1006-3951.2026.04.011

滇中引水隧洞穿越活动断裂带加固措施现场测试

Field Test of Reinforcement Measures for the Tunnel of Central Yunnan Water Diversion Project Passing Through the Active Fault Zone

杜彦彪1

作者信息

  • 1. 兰州交通大学工程检测有限公司,甘肃 兰州 730000
  • 折叠

摘要

Abstract

The Yunnan Central Water Diversion Tunnel has a long route and crosses numerous regional faults,posing a serious threat to the safe construction and operation of the tunnel project.In order to study the problem of high external water inflow when crossing active faults in tunnels,this paper takes Xianglushan Tunnel crossing the Longpan-Qiaohou active fault zone as an example.Based on the analysis of the characteristics of the fault zone,the excavation exposure,disposal measures,and reinforcement effects of the downstream main tunnel passing through the F10-2 fault zone of Xianglushan Tunnel No.2 Branch were evaluated and analyzed to ensure the safety of tunnel construction.

关键词

滇中引水/香炉山隧洞/F10-2断裂带/涌水突泥/监测

Key words

Central Yunnan Water Diversion Project/Xianglushan Tunnel/F10-2 fault zone/water and mud inrush/monitor

分类

建筑与水利

引用本文复制引用

杜彦彪..滇中引水隧洞穿越活动断裂带加固措施现场测试[J].云南水力发电,2026,42(4):46-49,4.