基于非参数核密度估计的风光水火储系统灵活性评估方法研究

米熠 徐雪松 杨一鸣 邹鑫

中国电力2026,Vol.59Issue(4):12-23,12.
中国电力2026,Vol.59Issue(4):12-23,12.DOI:10.11930/j.issn.1004-9649.202508057

基于非参数核密度估计的风光水火储系统灵活性评估方法研究

Nonparametric kernel density estimation based wind-solar-hydro-thermal-storage system operational flexibility evaluation

米熠 1徐雪松 1杨一鸣 1邹鑫2

作者信息

  • 1. 国网经济技术研究院有限公司,北京 102209
  • 2. 华北电力大学 经济管理系,河北 保定 071003
  • 折叠

摘要

Abstract

With the rising penetration of new energy,uncertainties on both generation and load sides pose significant risks to power system stability.To scientifically assess the flexibility of a novel multi-source coupled power system(integrating wind,solar,thermal,hydro and energy storage),a collaborative analysis framework is proposed,combining interval estimation of bilateral generation-load uncertainties with stochastic production simulation.First,non-parametric kernel density estimation generates confidence intervals for new energy output and load,and extreme supply-demand scenarios are constructed to quantify such uncertainties.Second,via a hierarchical dispatching strategy,wind,photovoltaic and run-of-river hydropower are prioritized as equivalent negative loads.Considering system ramping constraints,an improved stochastic production simulation algorithm schedules thermal power unit output.Finally,reservoir-type hydropower under-takes remaining system load.In case of load shedding or new energy curtailment,energy storage devices regulate the system through charging and discharging.Case studies show non-parametric estimation effectively characterizes bilateral generation-load uncertainties.The proportions of load shedding and new energy curtailment due to insufficient system ramping capacity are 14.8%and 91.5%,respectively,indicating ramping constraints are critical to system stability.Energy storage configuration significantly enhances regulation capacity,reducing the loss of load probability(LOLP)and new energy curtailment probability by 8.6%and 34.1%,respectively.

关键词

等效电量函数法/库容式水电/非参数核密度估计/灵活性评估/新型电力系统

Key words

equivalent power function method/reservoir-type hydropower/nonparametric kernel density estimation/flexi-bility evaluation/new-type power system

引用本文复制引用

米熠,徐雪松,杨一鸣,邹鑫..基于非参数核密度估计的风光水火储系统灵活性评估方法研究[J].中国电力,2026,59(4):12-23,12.

基金项目

国家社会科学基金资助项目(23BGL024). This work is supported by the National Social Science Foundation of China(No.23BGL024). (23BGL024)