| 注册
首页|期刊导航|工程地质学报|饱和砂土层注浆-冻结联合技术冻结特性试验研究

饱和砂土层注浆-冻结联合技术冻结特性试验研究

李星 袁若琳 张德良 闫玥 马家冲

工程地质学报2026,Vol.34Issue(2):781-794,14.
工程地质学报2026,Vol.34Issue(2):781-794,14.DOI:10.13544/j.cnki.jeg.2025-0043

饱和砂土层注浆-冻结联合技术冻结特性试验研究

TRIAL STUDY ON FREEZING CHARACTERISTICS OF GROUTING-FREEZING TECHNOLOGY IN SATURATED SAND LAYER

李星 1袁若琳 2张德良 1闫玥 2马家冲3

作者信息

  • 1. 中交第三公路工程局有限公司,北京 101300,中国
  • 2. 天津大学水利工程智能建设与运维全国重点实验室,天津 300350,中国||天津大学建筑工程学院,天津 300350,中国
  • 3. 中国电建集团西北勘测设计研究院有限公司,西安 710000,中国
  • 折叠

摘要

Abstract

This study addresses the technical challenge of closing the freezing wall in saturated sand layers under strong seepage conditions by proposing a combined grouting and freezing method.A dual-hole grouting-freezing model test was conducted to systematically investigate the effects of seepage velocity and refrigerant temperature on the freezing characteristics of the grout-matrix composite.The test results indicate that:(1)The seepage field significantly delays the development of the freezing temperature field.Increased seepage velocity results in an overall temperature rise of the freezing field,with the temperature near the freezing pipes being dominated by the refrigerant,while the temperature at the distal end is controlled by seepage.(2)Higher seepage velocity reduces the thickness of the freezing wall of the grout-matrix composite upstream and downstream,prolongs the closure time,increases the average temperature of the frozen body,and causes the shape of the freezing wall to shift downstream.(3)Lower refrigerant temperature increases the thickness of the freezing wall,shortens the closure time,reduces the average temperature,and effectively improves the uniformity of the freezing effect.Furthermore,field monitoring results from a Tianjin metro connection tunnel validate the feasibility of this grouting-freezing combined technique under similar geological conditions.This study reveals the coupling mechanism of seepage and freezing and proposes the synergistic optimization of freezing effectiveness through refrigerant temperature regulation and grouting to retard seepage.The findings provide a theoretical basis for the combined grouting and freezing construction method in strata with strong seepage.

关键词

饱和砂土层/注浆-冻结/温度场/冻结壁/模型试验

Key words

Saturated sand layer/Grouting-freezing/Temperature field/Frozen wall/Model trial

分类

建筑与水利

引用本文复制引用

李星,袁若琳,张德良,闫玥,马家冲..饱和砂土层注浆-冻结联合技术冻结特性试验研究[J].工程地质学报,2026,34(2):781-794,14.

基金项目

企事业委托课题"盐碱地区海相沉积粉质黏土层注浆-冻结联合技术研究及应用"(资助号:TIDT11-05-2023-FW-023).This research is supported by the Enterprise-Commissioned Project:"Research and Application of Grouting-Freezing Combined Technique for Ma-rine-Deposited Silty Clay Layers in Saline-Alkali Areas"(Grant No.TIDT11-05-2023-FW-023). (资助号:TIDT11-05-2023-FW-023)