| 注册
首页|期刊导航|煤炭与化工|东庞矿复杂地质条件下防水闸门硐室设计与施工

东庞矿复杂地质条件下防水闸门硐室设计与施工

李善文

煤炭与化工2026,Vol.49Issue(4):31-34,4.
✕
煤炭与化工2026,Vol.49Issue(4):31-34,4.DOI:10.19286/j.cnki.cci.2026.04.006

东庞矿复杂地质条件下防水闸门硐室设计与施工

Design and construction of waterproof gate chamber under complex geological conditions in Dongpang Mine

李善文1

作者信息

  • 1. 冀中能源邢台矿业集团有限责任公司,河北邢台 054000
  • 折叠

摘要

Abstract

As a common technical means for mine water disaster prevention,the waterproof gate can realize the isolation of the flooded area in the case of water inrush and minimize the loss.In order to realize the partition isolation of No.2 coal and No.6 coal in the second coal extension area of Dongpang Mine,it was proposed to set up waterproof gate wall.Combined with the geological production conditions of No.6 coal,the waterproof pressure was determined to be 1.8 MPa,and the inverted conical structure that could withstand large water pressure was selected.The parameters such as the length and embedding depth of the waterproof gate wall were calculated.The construction process of waterproof gate wall was put forward,including chamber construction,post-wall grouting and pressure test.The water injection pressure test showed that the total water leakage of the gate wall after 24 h was 3.1 m3/h,which met the relevant regulations.

关键词

大断面/防水闸墙/倒锥形结构/嵌入深度/壁后注浆

Key words

large cross-section/waterproof gate wall/inverted conical structure/embedding depth/backwall grouting

分类

矿业与冶金

引用本文复制引用

李善文..东庞矿复杂地质条件下防水闸门硐室设计与施工[J].煤炭与化工,2026,49(4):31-34,4.

煤炭与化工

2095-5979

访问量0
|
下载量0
段落导航相关论文