江淮水利科技2026,Vol.21Issue(2):51-53,58,4.DOI:10.20011/j.cnki.JHWR.202602009
土石坝坝基帷幕灌浆抬动控制技术研究
Research on heave control during foundation curtain grouting for earth-rockfill dams
杨婷1
作者信息
- 1. 安徽省淠史杭灌区管理总局,安徽 六安 237005
- 折叠
摘要
Abstract
To address the challenge that rock mass uplift is prone to occur during grouting construction for earth-rockfill dams in areas with insufficient overburden thickness and poor rock mass stability,this paper carried out a systematic investigation from two aspects:optimization of packer selection and uplift control technology.The results indicated that both mechanical packers and inflatable packers with a relatively large diameter difference from the borehole opening could reduce grouting pressure loss.Moreover,the"hold-and-step pressurization"control strategy could effectively suppress rock mass uplift,thereby ensuring the safety and quality of foundation curtain grouting for earth-rockfill dams under thin overburden conditions.The paper provide reference value for curtain grouting construction in earth-rockfill dam foundation under similar geological conditions.关键词
土石坝坝基/帷幕灌浆/阻塞器选择/抬动控制/升压方式Key words
earth-rockfill dam foundation/grouting construction/packer selection/uplift control/pressurization method分类
建筑与水利引用本文复制引用
杨婷..土石坝坝基帷幕灌浆抬动控制技术研究[J].江淮水利科技,2026,21(2):51-53,58,4.