| 注册
首页|期刊导航|世界有色金属|探究如何提高常规锌湿法冶炼铜的浸出率

探究如何提高常规锌湿法冶炼铜的浸出率

朱喜华

世界有色金属Issue(7):7-9,3.
世界有色金属Issue(7):7-9,3.

探究如何提高常规锌湿法冶炼铜的浸出率

Exploring How to Improve the Leaching Rate of Copper in Conventional Zinc Wet Smelting

朱喜华1

作者信息

  • 1. 江西铜业铅锌金属有限公司,江西 九江 332500
  • 折叠

摘要

Abstract

To improve the leaching rate of copper in conventional zinc hydrometallurgy,the thermodynamic and kinetic basis of copper leaching should be clarified,including the potential pH equilibrium model of copper zinc system,the activation energy and rate equation of acid leaching reaction,and the influence mechanism of temperature/concentration on leaching kinetics.During this period,it is necessary to strengthen the pretreatment process.Common techniques include temperature control of zinc sulfide concentrate roasting,optimization of grinding fineness and slurry concentration,and setting ultrasonic assisted leaching parameters.To further improve the copper leaching rate,it is necessary to synergistically optimize the leaching process parameters,including sulfuric acid concentration and liquid-solid ratio matching technology,oxidant(H2O2/Fe3+)addition strategy,and synergistic control of stirring intensity and leaching time.Taking the E project as an example,this study quantitatively analyzes the role of the entire process optimization system in improving copper leaching rate,providing an effective path for optimizing the copper leaching process in conventional zinc wet smelting.

关键词

锌湿法冶炼/铜浸出率/热力学/动力学/工艺优化

Key words

zinc hydrometallurgy/Copper leaching rate/Thermodynamics/Dynamics/process optimization

分类

资源环境

引用本文复制引用

朱喜华..探究如何提高常规锌湿法冶炼铜的浸出率[J].世界有色金属,2026,(7):7-9,3.

世界有色金属

1002-5065

访问量1
|
下载量0
段落导航相关论文