电力勘测设计Issue(5):30-34,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2026.05.006
重覆冰区特高压交流线路地线融冰联络线路设计方案研究
Research on the Design Scheme of Ground Wire Ice Melting Connection Line for AC Ultra High Voltage Transmission in Heavy Ice Covered Sections
米凯 1王征 1郭瑞 1杨磊 1谭浩文1
作者信息
- 1. 中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075
- 折叠
摘要
Abstract
The Ganzi-Tianfu South 1 000 kV line of the Sichuan-Chongqing AC UHV project is China's first 1 000 kV AC UHV line located in a high-altitude and extremely heavy icing area.To ensure safe operation without affecting power supply,it is necessary to carry out non-power-off ground wire de-icing for the Mount Erlang and Mount Zhugang sections with extremely heavy icing.Considering the de-icing requirements of the line and the convenience of wiring,a de-icing interconnection line needs to be designed for power supply.Drawing on previous experience in high-voltage line de-icing design,through calculation and research,the design technical scheme for the voltage level,conductor,insulator string,ground clearance,and transmission tower of the ground wire de-icing interconnection line has been obtained,providing reference and experience for future non-power-off ground wire de-icing of more UHV lines in heavy icing areas.关键词
特高压交流线路/直流融冰/重覆冰区/爬电比距Key words
UHV DC line/DC ice melting/reicing area/specific creepage distance分类
信息技术与安全科学引用本文复制引用
米凯,王征,郭瑞,杨磊,谭浩文..重覆冰区特高压交流线路地线融冰联络线路设计方案研究[J].电力勘测设计,2026,(5):30-34,5.