| 注册
首页|期刊导航|广东电力|极端灾害下考虑VPP支撑的配电网供电恢复策略

极端灾害下考虑VPP支撑的配电网供电恢复策略

孙英英 李强 纪文康 张聪 赵学深

广东电力2026,Vol.39Issue(4):62-73,12.
广东电力2026,Vol.39Issue(4):62-73,12.DOI:10.3969/j.issn.1007-290X.2026.04.006

极端灾害下考虑VPP支撑的配电网供电恢复策略

Power Restoration Strategy for Distribution Network Considering VPP Support Under Extreme Disasters

孙英英 1李强 1纪文康 1张聪 2赵学深3

作者信息

  • 1. 东方电子股份有限公司,山东烟台 264000
  • 2. 淄博职业技术大学 电子电气工程学院,山东淄博 255300
  • 3. 山东理工大学 电气与电子工程学院,山东淄博 255000
  • 折叠

摘要

Abstract

Sudden extreme disasters will cause failures in the distribution networks,leading to load outages and rising to safety issues and economic losses.To address these problems,this paper proposes a load power supply restoration strategy for the distribution networks considering the support of virtual power plants(VPPs),which improves the load restoration rate of the distribution networks through the coordination of the distributed generation(DG),loads and energy storage in the VPPs.First,a descriptive model is constructed for the DGs,load and storage resources inside the distribution networks and VPPs,with modeling conducted for photovoltaic systems,energy storage devices,shiftable loads,curtail able loads and transferable loads.Second,a load power supply restoration strategy for the distribution networks based on island partitioning is proposed.Under normal operation conditions,the distribution network doesn't enter the islanding mode and energy interaction with VPPs is realized with the minimum operation cost.In the event of extreme disasters,the distribution network operates in the multi-islanding mode with the optimization objective of minimizing the load restoration cost.Then,a calculation method for the load power supply restoration strategy of the distribution networks based on rolling optimization is put forward.When an extreme disaster occurs,the distribution network determines the supporting capacity of VPPs by formulating electricity purchasing and selling prices,thereby increasing the load restoration capacity of the distribution network.Finally,the proposed scheme is verified by simulation based on the improved IEEE 33 bus system.The simulation results show that the load loss of the distribution network is effectively reduced by using the proposed strategy.

关键词

虚拟电厂/配电网/负荷供电/多孤岛运行/柔性负荷

Key words

virtual power plant/distribution network/load power supply/multi-island operation/flexible load

分类

信息技术与安全科学

引用本文复制引用

孙英英,李强,纪文康,张聪,赵学深..极端灾害下考虑VPP支撑的配电网供电恢复策略[J].广东电力,2026,39(4):62-73,12.

基金项目

国家自然科学基金项目(52407121) (52407121)

山东省高等学校青创科技支持计划项目(2024KJH039) (2024KJH039)

泰山产业领军人才工程专项项目(tscx202312067) (tscx202312067)

广东电力

1007-290X

访问量0
|
下载量0
段落导航相关论文