港口航道与近海工程2026,Vol.63Issue(3):15-19,5.DOI:10.16403/j.cnki.ggjs20260304
基于全生命周期成本的粉沙质海岸LNG码头总平面方案比选
Comparative Selection of General Layout Plans of an LNG Terminal Built on a Silty Coast Based on Life-Cycle Cost
葛兵 1刘璠2
作者信息
- 1. 唐山港集团股份有限公司,河北 唐山 063611
- 2. 中交第一航务工程勘察设计院有限公司,天津 300220
- 折叠
摘要
Abstract
Jingtang Harbor of Tangshan Port is located at a silty coast,intense sediment motion and severe silting lead to higher requirements for the general layout design of an LNG terminal.In view of the traditional comparison and selection of general layout plans focusing on the initial construction cost only,Life-Cycle Cost(LCC)method applied here to conduct a comparative analysis of the general layout plans of an LNG terminal on a silty coast.By establishing an LCC accounting system suitable for silty coastal scenarios,with special attention paid to the characteristic cost items such as the sediment silting treatment,and combined with the technical feasibility analysis,the optimum strategy was scientifically selected.This researches also provided a new idea and method for the design optimization of important port projects under similar coastal conditions.关键词
全生命周期成本/粉沙质海岸/LNG码头/泥沙淤积/总平面布置/方案比选Key words
full life-cycle cost/silty coast/LNG terminal/sediment deposition/general layout/comparison and selection of plans分类
交通工程引用本文复制引用
葛兵,刘璠..基于全生命周期成本的粉沙质海岸LNG码头总平面方案比选[J].港口航道与近海工程,2026,63(3):15-19,5.