首页|期刊导航|交通运输工程学报(英文版)|Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studies
交通运输工程学报(英文版)2026,Vol.13Issue(2):354-373,20.DOI:10.1016/j.jtte.2025.09.004
Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studies
Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studies
摘要
关键词
Tunnel drainage systems/Crystallization blockage/Prevention and treatment/Dongtianshan tunnelKey words
Tunnel drainage systems/Crystallization blockage/Prevention and treatment/Dongtianshan tunnel引用本文复制引用
Chongming Tian,Yueping Tong,Fei Ye,Haibao Zhang,Han Wang,Yaming Zhang,Hao Cui,Xingbo Han..Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studies[J].交通运输工程学报(英文版),2026,13(2):354-373,20.基金项目
The research was conducted with funding provided by the National Natural Science Foundation for General Project of China(51878060),the Science and Technology Projects of Xizang Autonomous Region,China(XZ202501YD0007),the Xi'an Science and Technology Plan Project(23KGDW0035-2023),and the Shaanxi Provincial Science and Technology Plan Project(2024GX-YBXM-378). (51878060)