| 注册
首页|期刊导航|工矿自动化|基于人工势场融合改进蜣螂优化算法的煤矿机器人路径规划

基于人工势场融合改进蜣螂优化算法的煤矿机器人路径规划

张腾龙 朱洪波

工矿自动化2026,Vol.52Issue(4):55-67,13.
工矿自动化2026,Vol.52Issue(4):55-67,13.DOI:10.13272/j.issn.1671-251x.2026010086

基于人工势场融合改进蜣螂优化算法的煤矿机器人路径规划

Path planning of coal mine robots based on improved dung beetle optimizer integrated with artificial potential field

张腾龙 1朱洪波1

作者信息

  • 1. 安徽理工大学电气与信息工程学院,安徽淮南 232001
  • 折叠

摘要

Abstract

To address the problems of slow convergence,tortuous paths,and susceptibility to local optima in the path planning of coal mine robots caused by unstructured underground environments and dynamic obstacle interference,a path planning method for coal mine robots based on an Improved Dung Beetle Optimizer(IDBO)integrated with Artificial Potential Field(APF),namely the AIDBO algorithm,was proposed.To improve the insufficient population diversity of the traditional DBO algorithm,an IDBO algorithm was proposed.Singer chaotic mapping was introduced to initialize the population,which improved the uniformity of the initial solution distribution in complex roadways.A logarithmic spiral opposition-based learning strategy and a nonlinear adaptive contraction factor were integrated,which enhanced the ability of the algorithm to escape from local optima and jointly balanced global and local search.To solve the problem that the IDBO algorithm may still generate paths close to or even crossing obstacles in complex mine obstacle scenarios,a fitness-obstacle dual-driven gain-adaptive strategy was constructed.The APF was embedded into the IDBO algorithm as a post-processing operator,and the potential field mechanism was used to perform secondary smoothing and local fine-tuning of the global path.Simulation results showed that in a 30×30 static grid map,the shortest path length planned by the AIDBO algorithm was 45.053 7 cm,which was reduced by 15.4%compared with the IDBO algorithm and by 22.0%compared with the DBO algorithm.In a 40×40 dynamic grid map,the shortest path length planned by the AIDBO algorithm was 58.526 1 cm,which was reduced by 20.3%compared with the IDBO algorithm and by 28.2%compared with the DBO algorithm.Compared with five other algorithms such as particle swarm optimization and sparrow search algorithm,the AIDBO algorithm exhibited faster convergence speed and achieved the shortest planned path length,and it maintained excellent robustness and computational efficiency in complex dynamic scenarios.

关键词

煤矿机器人/路径规划/蜣螂优化算法/人工势场/复杂环境避障/轨迹平滑

Key words

coal mine robot/path planning/Dung Beetle Optimizer/Artificial Potential Field/obstacle avoidance in complex environment/trajectory smoothing

分类

矿业与冶金

引用本文复制引用

张腾龙,朱洪波..基于人工势场融合改进蜣螂优化算法的煤矿机器人路径规划[J].工矿自动化,2026,52(4):55-67,13.

基金项目

国家自然科学基金项目(62003001) (62003001)

安徽省自然科学基金项目(2508085MF169) (2508085MF169)

安徽高校自然科学研究重大项目(2023AH040157). (2023AH040157)

工矿自动化

1671-251X

访问量0
|
下载量0
段落导航相关论文