首页|期刊导航|南方电网技术|基于来水多区间不确定集的梯级水电站优先发电计划电量两阶段分解方法

基于来水多区间不确定集的梯级水电站优先发电计划电量两阶段分解方法

冷媛 梁梓杨 吴洋 隋坤明 卢治霖 刘双全 谢一工 董萍

南方电网技术2026,Vol.20Issue(4):107-118,12.
✕
南方电网技术2026,Vol.20Issue(4):107-118,12.DOI:10.13648/j.cnki.issn1674-0629.2026.04.010

基于来水多区间不确定集的梯级水电站优先发电计划电量两阶段分解方法

Two-Stage Decomposition Method for Preferential Power Generation Plan Electricity of Cascade Hydropower Stations Based on Multi-Band Uncertainty Set of Inflow Water

冷媛 1梁梓杨 1吴洋 2隋坤明 3卢治霖 1刘双全 2谢一工 2董萍3

作者信息

  • 1. 南方电网能源发展研究院,广州 510663
  • 2. 云南电网有限责任公司电力调度控制中心,昆明 650011
  • 3. 华南理工大学电力学院,广州 510641
  • 折叠

摘要

Abstract

With the construction of the southern regional power market,the scale of cross-provincial and cross-regional power transac-tions is gradually expanding.In the future,the co-existence of the dual-track system of plan and market is expected to exist for a long time,in which the decomposition of the contracted power is of great significance to the market operation and the interests of the market entities.To better promote the implementation of the scheduling plan of the power generations and ensure the interests of the market entities,a two-stage decomposition method of the preferential power generation plan electricity based on multi-band uncertainty sets of inflow water is proposed.In the first stage of power decomposition,the annual power decomposition model for the wet season and the dry season is established by taking into account the characteristics of inflow water during the wet season and the dry season,so as to realize the seasonal decomposition of the annual power to the month.And then,with the goal of consistency of the power generation progress,a monthly power decomposition to daily model based on the consistency of progress coefficients is established.In the second stage of power decomposition,the uncertainty of inflow water is considered and described as a multi-band uncertainty set,and a two-layer model is used to solve the conservative power decomposition curve under the power decomposition curve of the first stage,starting from the time scale of the monthly power decomposition to the day.Finally,the planned power decomposition curves and conservative power decomposition curves of each station are obtained by decomposing the hydropower sta-tions in Yunnan Province as an example,and the effectiveness of the method proposed is comparatively analyzed.

关键词

优先发电计划/梯级水电站/两阶段分解/保守电量

Key words

preferential power generation plan/cascade hydropower stations/two-stage decomposition/conservative power

分类

信息技术与安全科学

引用本文复制引用

冷媛,梁梓杨,吴洋,隋坤明,卢治霖,刘双全,谢一工,董萍..基于来水多区间不确定集的梯级水电站优先发电计划电量两阶段分解方法[J].南方电网技术,2026,20(4):107-118,12.

基金项目

国家自然科学基金资助项目(52079014) (52079014)

广东省海上风电联合基金资助项目(2022A1515240076) (2022A1515240076)

中国南方电网有限责任公司科技项目(YNKJXM20222399). Supported by the National Nature Science Fundation of China(52079014) (YNKJXM20222399)

the Guangdong Natural Science Foundation Off-shore Wind Power Joint Fund(2022A1515240076) (2022A1515240076)

the Science and Technical Project of China Southern Power Grid Co.,Ltd.(YNKJXM2 0222399). (YNKJXM2 0222399)