| 注册
首页|期刊导航|科技创新与应用|基于集成模型的飞机零部件装配工时定额技术

基于集成模型的飞机零部件装配工时定额技术

吴庆锡

科技创新与应用2026,Vol.16Issue(13):22-25,4.
科技创新与应用2026,Vol.16Issue(13):22-25,4.DOI:10.19981/j.CN23-1581/G3.2026.13.006

基于集成模型的飞机零部件装配工时定额技术

吴庆锡1

作者信息

  • 1. 哈尔滨飞机工业集团有限责任公司,哈尔滨 150066
  • 折叠

摘要

Abstract

In order to further improve the accuracy of prediction results of aircraft parts assembly man-hours,an aircraft parts assembly man-hours quota technology based on integrated model is proposed.The assembly man-hour quota model based on assembly difficulty coefficient analyzes the influence of factors such as assembly process and material characteristics on assembly man-hours from a microscopic perspective;an assembly man-hour quota model based on data envelopment analysis analyzes the input-output of the entire assembly line on assembly man-hours from a macro perspective.After combining the advantages of the two models to obtain an integrated model,this paper designs experiments to compare man-hour predictions.The results show that the man-hour prediction accuracy of the integrated model is higher than that of the single model,and both estimation efficiency and estimation accuracy are improved.

关键词

飞机零部件/数据包络分析法/工时定额/装配难度系数/集成模型

Key words

aircraft part/data envelopment analysis/man-hour quota/assembly difficulty coefficient/integrated model

分类

航空航天

引用本文复制引用

吴庆锡..基于集成模型的飞机零部件装配工时定额技术[J].科技创新与应用,2026,16(13):22-25,4.

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文