| 注册
首页|期刊导航|International Journal of Agricultural and Biological Engineering|Cooperative scheduling method for harvester and grain transport vehicle based on IMPA algorithm

Cooperative scheduling method for harvester and grain transport vehicle based on IMPA algorithm

Huanyu Liu Jiahao Luo Lihan Zhang Hao Yu Shun Zou Shuang Wang

International Journal of Agricultural and Biological Engineering2026,Vol.19Issue(1):P.226-240,15.
✕
International Journal of Agricultural and Biological Engineering2026,Vol.19Issue(1):P.226-240,15.DOI:10.25165/j.ijabe.20261901.9373

Cooperative scheduling method for harvester and grain transport vehicle based on IMPA algorithm

Huanyu Liu 1Jiahao Luo 1Lihan Zhang 1Hao Yu 1Shun Zou 1Shuang Wang1

作者信息

  • 1. Institute of Modern Agricultural Equipment,Xihua University,Chengdu 610039,China
  • 折叠

摘要

关键词

cooperative operation/scheduling/harvester/grain transport vehicle/marine predators algorithm

分类

农业科技

引用本文复制引用

Huanyu Liu,Jiahao Luo,Lihan Zhang,Hao Yu,Shun Zou,Shuang Wang..Cooperative scheduling method for harvester and grain transport vehicle based on IMPA algorithm[J].International Journal of Agricultural and Biological Engineering,2026,19(1):P.226-240,15.

基金项目

supported by the National Natural Science Foundation of China(Grant No.32501805) (Grant No.32501805)

the Sichuan Provincial Natural Science Foundation(Grant No.2025ZNSFSC1004) (Grant No.2025ZNSFSC1004)

the Sichuan Provincial Science and Technology Program(Grant No.2025NZZ10009). (Grant No.2025NZZ10009)

International Journal of Agricultural and Biological Engineering

1934-6344

访问量0
|
下载量0
段落导航相关论文