摘要

Abstract

Under the background of constructing new-type power systems,the rational configuration of distributed energy resources,energy storage systems,power-to-hydrogen(P2H)devices,and reactive power compensation equipment is a critical pathway to enhancing the economy,flexibility,and reliability of distribution networks.Aiming at the electricity-storage-hydrogen interaction system on the distribution network side,an optimization model with hierarchical configuration for distribution networks considering the characteristics of multiple types of equipment was proposed by establishing equivalent node power flow models for distributed energy resources such as wind and solar power,energy storage,and P2H devices.The upper-level model determined the site selection and capacity planning schemes for equipment such as distributed energy resources and energy storage with the objective of minimizing annual investment,construction,operation and maintenance costs.The lower level determined the operation strategies for distributed energy resources,energy storage,P2H devices,and static var compensators on typical days with the objective of optimizing voltage stability in the distribution network.Taking the IEEE 33-node system as an example,optimization analysis was conducted using an improved multi-objective particle swarm optimization algorithm.The simulation results showed that the addition of energy storage systems and the integration of equipment such as P2H devices reduced the system's annual economic costs by 21.17%,lowered the wind and solar power curtailment costs by 79.67%,and effectively enhanced the system voltage stability.

关键词

主动配电网/储能/电制氢设备/分层配置/弃风弃光

Key words

active distribution network/energy storage/power-to-hydrogen equipment/hierarchical configurationl/wind and solar power curtailment

分类

能源科技

引用本文复制引用

金熙林,张超,郝俊红,徐超,朱国金,贾浩帅..计及电制氢设备特性的主动配电网分层配置与优化[J].综合智慧能源,2026,48(5):44-55,12.

基金项目

中央企业绿色氢能制储运创新联合体联合攻关重点任务7 ()

中国电力建设集团有限公司科技项目(DJ-HXGG-2024-05) Key Task 7 of Green Hydrogen Energy Production,Storage,and Transportation Innovation Consortium for Central State-Owned Enterprises (DJ-HXGG-2024-05)

Science and Technology Project of Power Construction Corporation of China(DJ-HXGG-2024-05) (DJ-HXGG-2024-05)