| 注册
首页|期刊导航|水力发电|水电工程全生命周期视角下移民安置城镇迁建有关关键要素分析

水电工程全生命周期视角下移民安置城镇迁建有关关键要素分析

彭幼平 姚凯文

水力发电2026,Vol.52Issue(6):10-15,6.
水力发电2026,Vol.52Issue(6):10-15,6.

水电工程全生命周期视角下移民安置城镇迁建有关关键要素分析

Key Elements for Relocation and Reconstruction of Resettlement Urban and Town from the Perspective of the Full Life Cycle of Hydropower Projects

彭幼平 1姚凯文2

作者信息

  • 1. 水电水利规划设计总院有限公司,北京 100011||华北电力大学水利与水电工程学院,北京 102206
  • 2. 华北电力大学水利与水电工程学院,北京 102206
  • 折叠

摘要

Abstract

Implementing new-type urbanization constitutes an inevitable pathway to advancing the modernization drive.For populations displaced by large-scale hydropower projects,prioritizing urban resettlement with supplementary alternatives has emerged as the prevailing development trend for both the present and the future.From the perspective of the full life cycle of hydropower projects,this paper proposes the principles for phase division of hydropower resettlement,takes the relocation and reconstruction of resettlement towns as the core thread,analyzes the key elements of each phase,and integrates the entire chain of relocation and reconstruction of hydropower resettlement towns.Through an in-depth analysis of the typical case concerning the relocation and reconstruction of two county seats for the XJB Hydropower Station,the paper demonstrates the necessity of incorporating the full life cycle perspective of hydropower projects into the relocation and reconstruction of resettlement towns,and highlights the significance of key factors such as site selection and reserved space for future development.It is anticipated that this research will provide a valuable reference for the resettlement planning and implementation of subsequent major hydropower projects,including the LP Hydropower Station.

关键词

全生命周期/水电工程移民安置/城镇迁建/关键要素

Key words

full life cycle/resettlement of hydropower project/urban relocation and reconstruction/key element

分类

社会科学

引用本文复制引用

彭幼平,姚凯文..水电工程全生命周期视角下移民安置城镇迁建有关关键要素分析[J].水力发电,2026,52(6):10-15,6.

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文