| 注册
首页|期刊导航|沈阳工业大学学报|考虑配电网电源侧故障的区域检修负荷转移方法

考虑配电网电源侧故障的区域检修负荷转移方法

韩君孝 范钟 李永清 张小江 张乐桢

沈阳工业大学学报2026,Vol.48Issue(3):32-39,8.
沈阳工业大学学报2026,Vol.48Issue(3):32-39,8.DOI:10.7688/j.issn.1000-1646.2026.03.05

考虑配电网电源侧故障的区域检修负荷转移方法

Regional maintenance load transfer method considering power supply side faults in distribution networks

韩君孝 1范钟 2李永清 3张小江 4张乐桢5

作者信息

  • 1. 兰州交通大学电气工程学院,甘肃兰州 730070||国网甘肃省电力公司白银供电公司 城区供电分公司,甘肃白银 730900
  • 2. 国网甘肃省电力公司白银供电公司 城区供电分公司,甘肃白银 730900
  • 3. 国网甘肃省电力公司白银供电公司 设备管理部,甘肃白银 730900
  • 4. 国网甘肃省电力公司白银供电公司 白银银珠电力(集团)有限责任公司,甘肃白银 730900
  • 5. 国网甘肃省电力公司白银供电公司 数字化通信部,甘肃白银 730900
  • 折叠

摘要

Abstract

[Objective]Power supply side faults in distribution networks are prone to cause three-phase current unbalance,which may further lead to regional power supply interruption and threaten the safe and stable operation of the power grid.Traditional load transfer strategies usually only focus on power balance,without fully considering the impact of negative sequence current distribution on system recovery,which tends to result in disadvantages such as low recovery efficiency and frequent switch operations.To address this problem,aiming at the scenario of power supply side faults in distribution networks,a regional maintenance load transfer method was proposed to achieve efficient grid recovery after faults and optimize load loss,network loss,and the number of switch operations.[Methods]The symmetrical component method was adopted to calculate the negative sequence current in the fault composite sequence network.By comparing the phase difference between the fault phase voltage phasor and the negative sequence current and setting a threshold value,the area to be restored and power outage area were accurately located.After the area division,load transfer was carried out.A multi-objective load transfer optimization model was established,which took the minimization of combined load loss,the number of tie switch operations,and additional network loss as the objectives,with six constraints including topological structure and load controllability set.In view of the conflicts among multiple objective functions,a hybrid algorithm combining genetic algorithm and heuristic search algorithm was used for solution,which could effectively avoid falling into local optimal solutions.Based on the topological analysis and judgment results,available tie switches and preliminary load transfer schemes were searched.Combined with various influencing factors,the hybrid algorithm was applied to obtain the optimal transfer path and generate the best load transfer scheme.By adjusting the states of tie switches,the load was transferred from the area to be restored to the power outage area,which thereby restored power distribution and supply.[Results]To verify the effectiveness of the proposed method,a simulation test was carried out on a 10 kV distribution network in a certain area.The test results show that the average load loss of the proposed method is only 0.215 3 kW,and the additional network loss is relatively small.The minimum number of tie switch operations is only 9 times,and the voltage of each node is generally maintained at a high level,which ensures power supply reliability.[Conclusions]By accurately analyzing the negative sequence current distribution,reasonably dividing the fault-affected areas,and realizing load transfer based on multi-objective optimization,the proposed method effectively avoids the performance trade-off phenomenon in traditional strategies.This method can balance power supply reliability,economy,and rapid recoverability,providing a new technical path for handling power supply side faults in distribution networks,which has significant engineering practical value and popularization prospects.Future research will further combine with dynamic topological reconfiguration and intelligent prediction technologies to enhance its adaptability in complex fault scenarios.

关键词

配电网/电源侧故障/区域检修/负序电流特性/负荷转移/遗传算法/启发式搜索/多目标优化

Key words

distribution network/power supply side fault/regional maintenance/negative sequence current characteristic/load transfer/genetic algorithm/heuristic search/multi-objective optimization

分类

信息技术与安全科学

引用本文复制引用

韩君孝,范钟,李永清,张小江,张乐桢..考虑配电网电源侧故障的区域检修负荷转移方法[J].沈阳工业大学学报,2026,48(3):32-39,8.

基金项目

甘肃省自然科学基金项目(21JR7RA300) (21JR7RA300)

国网甘肃省电力公司白银供电公司项目(SGGSBY00HUS2310696). (SGGSBY00HUS2310696)

沈阳工业大学学报

1000-1646

访问量0
|
下载量0
段落导航相关论文