| 注册
首页|期刊导航|云南水力发电|高寒地区面板坝表面止水设计及施工技术

高寒地区面板坝表面止水设计及施工技术

白海波

云南水力发电2026,Vol.42Issue(5):80-83,4.
✕
云南水力发电2026,Vol.42Issue(5):80-83,4.DOI:10.3969/j.issn.1006-3951.2026.05.018

高寒地区面板坝表面止水设计及施工技术

Design and Construction Technology of Surface Waterproofing for Panel Dams in High-altitude Region

白海波1

作者信息

  • 1. 中电建电力投资集团有限公司,甘肃 兰州 730000
  • 折叠

摘要

Abstract

The water stop system is a key component of the anti-seepage system in concrete face rockfill dams.In order to adapt to the settlement and deformation of the dam body,various structural joints need to be set up for the panel dam.However,in high-altitude areas where the water level changes,the surface layer waterproofing and fixing components are easily damaged by frost heave and lose their fixing function.The rock fill dam project of a certain pumped storage power station adopts a submerged water stop structure on the surface of the panel dam,and the surface plastic filling is directly constructed using a molding machine.At the same time,polyurea is applied to all structural joints and water level fluctuation areas to ensure that the surface water stop is not damaged by freezing ice.After the power station was filled with water,two complete freeze-thaw monitoring tests showed that this technology has certain advantages in the engineering application of panel dams in high-altitude areas.

关键词

面板坝/高寒地区/冻融/表面止水/设计施工

Key words

panel dam/high-altitude region/freeze thaw/surface waterproofing/design and construction

分类

建筑与水利

引用本文复制引用

白海波..高寒地区面板坝表面止水设计及施工技术[J].云南水力发电,2026,42(5):80-83,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文