大采高工作面接续开采覆岩稳定性数值模拟研究

朱德俊 肖静洋 许广辉 宋高峰

陕西煤炭2026,Vol.45Issue(6):24-30,7.
✕
陕西煤炭2026,Vol.45Issue(6):24-30,7.DOI:10.20120/j.cnki.issn.1671-749x.2026.0604

大采高工作面接续开采覆岩稳定性数值模拟研究

Numerical simulation on overburden stability during successive mining of large mining height working faces

朱德俊 1肖静洋 1许广辉 1宋高峰1

作者信息

  • 1. 北方工业大学 土木工程学院,北京 100144
  • 折叠

摘要

Abstract

To address the stability issues of surrounding rock during successive mining in large-height mining faces,this study establishes a numerical model using Phase 2D finite element software to systematically investigate the evolution characteristics of plastic zones in overburden strata,surface subsidence,roof convergence,and stress distribution in protective coal pillars under different mining heights.The results demonstrate,With the increase of mining disturbance,the scope of overburden failure and the degree of deformation gradually increase.When the mining height is 5 m,the number of failure units in the overburden plastic zone is 547 after the first mining face is mined,and surges to 3 984 after the second mining face is mined.The plastic zone exhibits an arched feature of"wide upper part and narrow lower part"and expands toward the roof.The maximum surface subsidence increases from 0.14 m to 0.52 m;the roof subsidence increases from 0.30 m to 0.65 m;and the peak abutment pressure of the protective coal pillar increases from 58.36 MPa to 130.16 MPa.Enhanced mining heights significantly reduce overburden stability during successive mining operations.When mining height increases from 3 m to 5 m,the plastic failure units increase by 107%,surface subsidence escalates by 271%,roof convergence amplifies 282%,and the abutment pressure coefficient in coal pillars rises from 3.68 to 8.38.This research reveals the substantial impacts of mining height and face succession on overburden stability.

关键词

数值模拟/工作面接续开采/覆岩破坏/地表沉降/煤柱稳定性

Key words

numerical simulation/successive mining of working faces/overburden failure/surface subsidence/coal pillar stability

分类

矿业与冶金

引用本文复制引用

朱德俊,肖静洋,许广辉,宋高峰..大采高工作面接续开采覆岩稳定性数值模拟研究[J].陕西煤炭,2026,45(6):24-30,7.

基金项目

国家自然科学基金资助项目(52004010) (52004010)

北京市属高等学校优秀青年人才培育计划项目(BPHR202203036) (BPHR202203036)

贵州省科技计划项目(黔科合支撑[2023]一般122) (黔科合支撑[2023]一般122)

北方工业大学毓秀创新项目(2024NCUTYXCX209) (2024NCUTYXCX209)

陕西煤炭

1671-749X

访问量0
|
下载量0
段落导航相关论文