| 注册
首页|期刊导航|陕西煤炭|岳城煤矿短壁间隔矸石充填开采技术研究与应用

岳城煤矿短壁间隔矸石充填开采技术研究与应用

琚韶梁

陕西煤炭2026,Vol.45Issue(6):184-189,6.
✕
陕西煤炭2026,Vol.45Issue(6):184-189,6.DOI:10.20120/j.cnki.issn.1671-749x.2026.0628

岳城煤矿短壁间隔矸石充填开采技术研究与应用

Short-wall interval gangue filling mining technology in Yuecheng Coal Mine

琚韶梁1

作者信息

  • 1. 晋能控股集团沁秀公司岳城煤矿,山西 晋城 048200
  • 折叠

摘要

Abstract

In order to tackle the challenges of coal resource mining beneath the industrial square and villages in Yuecheng Coal Mine,as well as gangue disposal,the mine plans to adopt a short-wall interval paste filling mining technology system.By constructing a phased mining model of"mining one and retaining two"and employing an interval filling process with skip mining,the working face is divided into composite units of 5m branch roadways and 10 m coal pillars,forming a three-phase alternating advancement system for simultaneous mining and filling.Research indicates that the paste mix(cementitious material 200 kg/m3,fly ash 350 kg/m3,gangue 1250 kg/m3)achieves a 28-day strength of≥3.5 MPa and an active roof-contact expansion rate of 5%~10%.The collaborative filling process with dual discharge outlets ensures a roof-contact rate exceeding 95%,reducing the mining-filling cycle to 7 days per coal pillar.The predicted maximum surface subsidence is 135 mm,with horizontal deformation of 0.30 mm/m,both below the Grade I damage threshold for buildings(structures).Engineering applications demonstrate that this technology processes 900,000 tons of gangue annually,releases 593,000 tons of trapped coal,and generates comprehensive benefits of 153 million yuan.

关键词

短壁间隔矸石充填/充填材料配比/地表变形/经济效益

Key words

short-wall interval gangue filling/filling material ratio/surface deformation/economic benefits

分类

矿业与冶金

引用本文复制引用

琚韶梁..岳城煤矿短壁间隔矸石充填开采技术研究与应用[J].陕西煤炭,2026,45(6):184-189,6.

陕西煤炭

1671-749X

访问量0
|
下载量0