| 注册
首页|期刊导航|中国水利|洪水风险图推演实时性提升技术研究与实践应用

洪水风险图推演实时性提升技术研究与实践应用

陈胜 柴福鑫 刘业森 刘舒

中国水利Issue(11):24-30,7.
中国水利Issue(11):24-30,7.DOI:10.3969/j.issn.1000-1123.2026.11.003

洪水风险图推演实时性提升技术研究与实践应用

Research and practical application of techniques for improving real-time performance of flood risk map deduction

陈胜 1柴福鑫 1刘业森 1刘舒1

作者信息

  • 1. 中国水利水电科学研究院,100038,北京||水利部防洪抗旱减灾技术创新中心,100038,北京
  • 折叠

摘要

Abstract

The national flood risk map compilation project for 2024-2025 has put forward new requirements for the development of real-time dynamic deduction capabilities,aiming to enhance the practical support capacity of the forecasting,warning,rehearsal,and contingency planning applications for flood and drought disaster prevention.Traditional serial processing modes for flood risk deduction suffer from slow response speed and poor real-time performance,which fail to meet the timely and efficient demands of flood control scheduling and decision-making.This paper conducted technical research on improving the real-time performance of flood risk map deduction.Based on the research and development practice of a real-time dynamic deduction platform for flood risk maps,this paper systematically sorted out the entire business process of flood risk deduction and identified performance bottlenecks in key links,including scheme loading,model calculation,data access,and visual rendering.By integrating key technologies such as high-performance computing,efficient data access,and server-side background rendering,this paper innovatively constructed a parallel processing architecture consisting of computation flow,data access flow,and rendering flow,which broke the traditional technical mode that performs rendering only after the completion of full model calculation.The optimized technical solution has improved the interactive experience and practical application effectiveness of the system platform and has been applied in real-time dynamic flood risk map deduction platforms of the Ministry of Water Resources,the Taihu Lake basin,and Anhui Province.By taking the 250,000-grid deduction scenario of the Mengwa Flood Detention Area as a case study,the results show that compared with the 15-minute waiting time for presenting flood analysis results in the traditional mode,the proposed architecture can output the first frame of deduction visualization results within 20 seconds,with each subsequent frame updated in only 2 seconds.It supports arbitrary suspension and termination of the deduction process,effectively improving the flexibility and timeliness of flood control decision support,providing a technical reference for the construction of real-time dynamic deduction platforms for flood risk maps in other provinces and basins nationwide.

关键词

洪水风险图/实时性/动态性/数据缓存/后台图像渲染/动态推演平台/并行计算架构

Key words

flood risk map/real-time performance/dynamic characteristic/data caching/background image rendering/dynamic deduction platform/parallel computing architecture

分类

建筑与水利

引用本文复制引用

陈胜,柴福鑫,刘业森,刘舒..洪水风险图推演实时性提升技术研究与实践应用[J].中国水利,2026,(11):24-30,7.

基金项目

国家重点研发计划项目"蓄滞洪区立体感知与运用智能决策关键技术"(2024YFC3012300). (2024YFC3012300)

中国水利

1000-1123

访问量0
|
下载量0
段落导航相关论文