| 注册
首页|期刊导航|测绘学报(英文版)|Study on LO-RIME-BiLSTM-Based Short-Term Prediction Algorithm for BDS-3 Clock Bias

Study on LO-RIME-BiLSTM-Based Short-Term Prediction Algorithm for BDS-3 Clock Bias

WANG Xu

测绘学报(英文版)2026,Vol.19Issue(1):64-79,16.
测绘学报(英文版)2026,Vol.19Issue(1):64-79,16.DOI:10.11947/j.JGGS.2026.0104

Study on LO-RIME-BiLSTM-Based Short-Term Prediction Algorithm for BDS-3 Clock Bias

Study on LO-RIME-BiLSTM-Based Short-Term Prediction Algorithm for BDS-3 Clock Bias

WANG Xu1

作者信息

  • 1. School of Resources and Civil Engineering,Liaoning Institute of Science and Technology,Benxi 117004,China||Liaoning Engineering Research Center of Utilization of Recycled Industrial Solid Wastes as Building Materi-als,Benxi 117004,China
  • 折叠

摘要

关键词

satellite clock bias/precise point positioning/bilstm/rime optimization

Key words

satellite clock bias/precise point positioning/bilstm/rime optimization

引用本文复制引用

WANG Xu..Study on LO-RIME-BiLSTM-Based Short-Term Prediction Algorithm for BDS-3 Clock Bias[J].测绘学报(英文版),2026,19(1):64-79,16.

基金项目

2023 Liaoning Institute of Science and Technology Doctoral Program Launch fund(No.2307B29). (No.2307B29)

测绘学报(英文版)

2096-5990

访问量0
|
下载量0
段落导航相关论文