构网型储能支撑新型电力系统建设的规划应用及挑战

徐宇豪 宋晨辉 曹一家 李超 谢惠藩 刘春晓 肖峻

电力建设2026,Vol.47Issue(6):1-16,16.
✕
电力建设2026,Vol.47Issue(6):1-16,16.DOI:10.12204/j.issn.1000-7229.2026.06.001

构网型储能支撑新型电力系统建设的规划应用及挑战

Planning Application and Challenges of Grid-Forming Energy Storage in Supporting New Power System Construction

徐宇豪 1宋晨辉 2曹一家 1李超 3谢惠藩 4刘春晓 4肖峻3

作者信息

  • 1. 电网防灾减灾全国重点实验室(长沙理工大学),长沙市 410114
  • 2. 电网防灾减灾全国重点实验室(长沙理工大学),长沙市 410114||智能配用电装备与系统全国重点实验室(天津大学),天津市 300072
  • 3. 智能配用电装备与系统全国重点实验室(天津大学),天津市 300072
  • 4. 中国南方电网电力调度控制中心,广州市 510663
  • 折叠

摘要

Abstract

[Objective]Under the"Carbon peaking and carbon neutrality"goals,as a critical technology for adapting power systems to high proportions of renewable energy,the application advantages of grid-forming energy storage(GFMES)have not been fully exploited.Therefore,there is an urgent need to clarify its active support mechanisms and planning methods across multiple scenarios in the new power system.[Methods]This paper summarizes the voltage support,frequency support,and inertia support mechanisms of GFMES from the perspective of grid-forming control.Planning methods are then reviewed for normal operating conditions,small-disturbance conditions,and large-disturbance conditions.Combined with engineering demonstrations,the planning roles,key requirements,and multi-condition coordination issues of GFMES are further analyzed in renewable energy export systems,HVDC receiving-end nearby grids,and microgrids.[Results]Existing studies have established condition-oriented planning frameworks:normal-operation planning mainly emphasizes techno-economic performance;small-disturbance planning focuses on system strength and frequency stability;large-disturbance planning highlights whole-process coordination of prevention,fault ride-through,and post-fault recovery.Meanwhile,the functional role,dominant constraints,and planning requirements of GFMES differ significantly across application scenarios.[Conclusions]GFMES planning exhibits strong scenario dependence and multi-condition coupling.System strength,voltage/frequency security margins,and fault recovery requirements are the key constraints governing siting and sizing.Future work should develop coordinated planning methods that jointly consider technical constraints and economic performance.

关键词

构网型储能(GFMES)/高比例新能源电力系统/规划配置/应用场景/主动支撑

Key words

grid-forming energy storage(GFMES)/high-renewable-penetration power system/planning and configuration/application scenarios/active support

分类

信息技术与安全科学

引用本文复制引用

徐宇豪,宋晨辉,曹一家,李超,谢惠藩,刘春晓,肖峻..构网型储能支撑新型电力系统建设的规划应用及挑战[J].电力建设,2026,47(6):1-16,16.

基金项目

国家自然科学基金项目(52307079) (52307079)

中国博士后基金项目(2025M780479) (2025M780479)

湖南省芙蓉计划青年人才项目(2025QT-91) (2025QT-91)

湖南省自然科学基金(2024JJ6050) (2024JJ6050)

南方电网公司重大科技项目(ZDKJXM20250036)This work is supported by National Natural Science Foundation of China(No.52307079),China Postdoctoral Science Foundation(No.2025M780479),Furong Plan for Young Talents of Hunan Province(No.2025QT-91),Natural Science Foundation of Hunan Province(No.2024JJ6050)and Science and Technology Project of China Southern Power Grid(No.ZDKJXM20250036). (ZDKJXM20250036)

电力建设

1000-7229

访问量0
|
下载量0
段落导航相关论文