| 注册
首页|期刊导航|工矿自动化|考虑动态需求的露天矿山无人驾驶矿卡实时调度方法

考虑动态需求的露天矿山无人驾驶矿卡实时调度方法

韩亮 李腾 王晓伟 谢国涛 姜磊 许海洋

工矿自动化2026,Vol.52Issue(5):137-145,9.
工矿自动化2026,Vol.52Issue(5):137-145,9.DOI:10.13272/j.issn.1671-251x.2026030003

考虑动态需求的露天矿山无人驾驶矿卡实时调度方法

Real-time scheduling method for unmanned mining trucks in open-pit mines considering dynamic demand

韩亮 1李腾 2王晓伟 3谢国涛 3姜磊 4许海洋4

作者信息

  • 1. 中车株洲电力机车研究所有限公司,湖南 株洲 412000
  • 2. 湖南大学机械与运载工程学院,湖南长沙 410082
  • 3. 湖南大学机械与运载工程学院,湖南长沙 410082||湖南大学无锡智能控制研究院,江苏无锡 214123
  • 4. 山东港口日照港集团有限公司,山东日照 276800
  • 折叠

摘要

Abstract

Most existing real-time scheduling methods for open-pit mines estimate the expected waiting time of mining trucks to be scheduled by considering only the influence of trucks en route on loading and unloading points,while ignoring the influence of subsequent trucks to be scheduled on current scheduling decisions,resulting in a lack of global foresight.Meanwhile,most methods lack systematic rescheduling strategies for emergencies such as mining truck failures.To address these problems,a real-time scheduling method for unmanned mining trucks in open-pit mines considering dynamic demand was proposed.This method calculated the arrival times of subsequent trucks to be scheduled at loading and unloading points and simultaneously assigned destinations to the current truck to be scheduled and subsequent trucks that could affect its decision.The expected waiting time of trucks to be scheduled was calculated according to the differentiated service rules of loading points,ore unloading points,and waste unloading points.A mining truck failure state determination rule was established based on the Poisson distribution,and when a truck failed,a truck of the same type was dispatched from the parking lot as a replacement.A real-time scheduling model was constructed with the objectives of minimizing total expected waiting time,total travel distance,total travel cost,and total shovel completion rate deviation,while comprehensively considering constraints such as rated truck load,empty and loaded speeds,loading and unloading times,and fuel consumption.Simulation results based on an actual mining area road network showed that,compared with the multi-objective model,shortest-queue model,and random model,the proposed model achieved the highest mining area output,the lowest transportation cost per ton of ore,and the highest shovel utilization rate.The average truck waiting time under the proposed model was slightly higher than that of the shortest-queue model overall,but significantly lower than those of the multi-objective model and random model.Under truck failure conditions,the output of the comparison models decreased to varying degrees,whereas the output of the proposed model remained basically stable.As the proportion of small trucks increased,the transportation cost per ton of ore and average truck waiting time both decreased,while mining area output first increased and then decreased.Therefore,the proportion of small trucks in the fleet can be appropriately increased when economic benefits are pursued.

关键词

露天矿山/无人驾驶矿卡/实时调度/多目标优化

Key words

open-pit mine/unmanned mining truck/real-time scheduling/multi-objective optimization

分类

矿业与冶金

引用本文复制引用

韩亮,李腾,王晓伟,谢国涛,姜磊,许海洋..考虑动态需求的露天矿山无人驾驶矿卡实时调度方法[J].工矿自动化,2026,52(5):137-145,9.

基金项目

国家重点研发计划项目(2025YFB4713100). (2025YFB4713100)

工矿自动化

1671-251X

访问量0
|
下载量0
段落导航相关论文