热力发电2026,Vol.55Issue(6):164-174,11.DOI:10.19666/j.rlfd.202509052
660 MW超超临界四角切圆锅炉烟气再循环墙式布置方式优化数值模拟
Numerical simulation of wall-mounted FGR arrangement optimization for a 660 MW ultra-supercritical tangentially-fired boiler
摘要
Abstract
[Objective]To address the issues of low reheated steam temperature and local overheating of platen superheaters(PSH)during low-load operation of a 660 MW ultra-supercritical tangentially fired once-reheat boiler,this study proposed a wall-mounted flue gas recirculation(FGR)arrangement in the burner region.The aim was to synergistically raise reheated steam temperature and suppress PSH overheating while maintaining combustion stability.[Methods]Numerical simulation was performed at 40%rated load to optimize the proposed layout.First,the baseline case and corner-mounted and wall-mounted concentrated FGR arrangements were compared.Subsequently,the feasibility of wall-mounted grouped injection was investigated.[Results]The results indicated that:corner-mounted FGR significantly increased the ignition distance of pulverized coal jets,which adversely affected low-load combustion stability.Both fire-side and rear-side concentrated FGR increased the heat absorption of the high-temperature reheater,but neither could simultaneously mitigate PSH local overheating.Fire-side grouped FGR substantially enhanced heat absorption of the reheater but still carried a risk of PSH overheating,whereas rear-side grouped FGR reduced the overheating risk but yielded only limited reheater improvement.A combined grouped arrangement,in which flue gas was injected through the two lower layers on the fire-side wall together with the upper layer on the rear-side wall,increased the heat absorption of the reheater by 18.9%,effectively mitigated local overheating of the PSH,and maintained stable combustion.[Conclusion]These findings provide design and optimization references for safe,flexible,and efficient boiler operation across wide load ranges in next-generation coal-fired power plants.关键词
四角切圆锅炉/烟气再循环/再热汽温/数值模拟/优化Key words
tangentially fired boiler/flue gas recirculation/reheated steam temperature/numerical simulation/optimization引用本文复制引用
梁杰,何闯,任利明,李源,王锋涛,董行,宋贺,马仑,方庆艳..660 MW超超临界四角切圆锅炉烟气再循环墙式布置方式优化数值模拟[J].热力发电,2026,55(6):164-174,11.基金项目
国家重点研发计划项目(2024YFB4106103) National Key Research and Development Program of China(2024YFB4106103) (2024YFB4106103)