摘要
Abstract
With the increasing demand for railway container transportation,in order to explore the reconstruction and expansion layout scheme of existing railway container stations,this paper analyzed the characteristics and applicable scenarios of three basic sea-rail combined transport modes:"water-road-rail"mode,"direct transfer between vehicles and ships"mode,and"water-yard-rail"mode,analyzed the key factors affecting the reconstruction and expansion of container stations,and compared the advantages and disadvantages of three common station layout diagrams:transversal type,longitudinal type,and combined type,providing theoretical support for the reconstruction and expansion of railway container stations.Taking Nansha Port South Station as an example,this paper deeply studied the impact of factors such as existing equipment and facilities,traffic volume demand,land conditions,loading and unloading equipment,and station operation modes on the reconstruction and expansion layout scheme of the station.Combined with the actual needs and conditions of Nansha Port South Station,a transversal reconstruction and expansion layout scheme adapting to its development needs was selected through comparison,providing a useful reference for the reconstruction and expansion of similar railway container stations.关键词
铁路集装箱场站/既有站改建/铁路布置方案/南沙港南站/海铁联运Key words
Railway Container Station/Reconstruction of Existing Station/Railway Layout Scheme/Nansha Port South Station/Sea-Rail Combined Transport分类
交通工程引用本文复制引用
徐蕾杰..既有铁路集装箱场站改扩建布置方案研究[J].铁路物流,2026,44(6):56-62,7.基金项目