| 注册
首页|期刊导航|中外公路|钢管混凝土拱桥封铰混凝土浇筑时机对比研究

钢管混凝土拱桥封铰混凝土浇筑时机对比研究

王晓亮 付凯歌 张松 王中强 陈卓异

中外公路2026,Vol.46Issue(3):142-149,8.
中外公路2026,Vol.46Issue(3):142-149,8.DOI:10.14048/j.issn.1671-2579.2026.03.016

钢管混凝土拱桥封铰混凝土浇筑时机对比研究

Comparative Study on Pouring Timing of Sealing Hinge Concrete for Concrete-Filled Steel Tube Arch Bridge

王晓亮 1付凯歌 1张松 1王中强 2陈卓异2

作者信息

  • 1. 中交二公局第五工程有限公司,陕西 西安 710119
  • 2. 长沙理工大学 土木与环境工程学院,湖南 长沙 410114
  • 折叠

摘要

Abstract

The pouring timing of sealing hinge concrete for concrete-filled steel tube arch bridges directly affects the construction duration and the stress state of arch ribs.To clarify the structural response differences at different pouring timings,the Beiliuhe Extra-large Bridge on the Pingxi-Cenxi Expressway in Guangxi Province was taken as the engineering background in this paper.A finite element model was established using Midas Civil,and the following four pouring timings of sealing hinge concrete were comparatively analyzed:immediately after the butt welding of sealing hinge steel pipes;after the closure of arch ribs and before the pouring of concrete inside pipes;after the pouring of concrete inside pipes and before the lifting of lattice girders;after the pouring of wet joints of the bridge deck and before the application of the second-phase dead load.Through the finite element simulation analysis of the whole construction process,the internal forces,stresses,and deformations of key parts under the four timings,as well as the deformations at the completed bridge stage,were compared.The results indicate that all four pouring timings of sealing hinge concrete are feasible;from the perspective of the strength and stability of chord pipes at the arch feet,timing 4(pouring the sealing hinge concrete after the pouring of wet joints of the bridge deck)is the most favorable.As long as there is no conflict in working surfaces,the pouring of sealing hinge concrete can be carried out at any construction stage after the butt welding of sealing hinge steel pipes.The reason for the above phenomenon is that the arch rib axis of this bridge is a catenary curve,which is mainly subjected to compression with a small bending moment under the dead load state.The research results provide a basis for selecting the pouring timing of sealing hinge concrete for this bridge and can serve as a reference for related construction of similar bridges.

关键词

钢管混凝土拱桥/封铰混凝土/浇筑时机/有限元仿真分析

Key words

concrete-filled steel tube arch bridge/sealing hinge concrete/pouring timing/finite element simulation analysis

分类

交通工程

引用本文复制引用

王晓亮,付凯歌,张松,王中强,陈卓异..钢管混凝土拱桥封铰混凝土浇筑时机对比研究[J].中外公路,2026,46(3):142-149,8.

基金项目

国家自然科学基金资助项目(编号:52478129) (编号:52478129)