建筑设计管理2026,Vol.43Issue(4):17-33,17.DOI:10.3969/j.issn.1673-1093.2026.04.002
在多业态综合体项目中推行设计总包的意义和作用
The Significance and Role of Implementing Integrated Design Contracting in Mixed-Use Complex Projects:A Case Study of the Changsha Minmetals Plaza Project
摘要
Abstract
From the perspective of a real estate developer,this paper explores the application and practice of the integrated design contracting management model in mixed-use complexes.Using the Changsha Minmetals Plaza project as a case study,it analyzes the complexities of multi-format projects and the challenges faced by traditional design management.It elaborates on the core competencies required for integrated design contracting,the delineation of roles and responsibilities,and the mechanisms for cross-disciplinary collaboration.Innovatively,it proposes a dual-track management framework combining"effect delivery contracting"and"integrated design contracting",providing a practical reference for similar projects.关键词
设计总包/多业态综合体/协同设计/BIM技术/效果总包Key words
integrated design contracting/mixed-use complex/collaborative design/BIM technology/effect delivery contracting分类
建筑与水利引用本文复制引用
常婷,刘波,王久生,王兆雄..在多业态综合体项目中推行设计总包的意义和作用[J].建筑设计管理,2026,43(4):17-33,17.