融合SNA和N-K的地下洞室施工进度风险耦合分析

黄建文 黎雅君 王兴霞 王宇峰 张建军 覃新友

人民长江2026,Vol.57Issue(6):197-204,251,9.
人民长江2026,Vol.57Issue(6):197-204,251,9.DOI:10.16232/j.cnki.1001-4179.2026.06.021

融合SNA和N-K的地下洞室施工进度风险耦合分析

Coupling analysis of construction schedule risk of underground caverns integrating SNA and N-K

黄建文 1黎雅君 1王兴霞 1王宇峰 1张建军 2覃新友2

作者信息

  • 1. 三峡大学 水电工程施工与管理湖北省重点实验室,湖北 宜昌 443002||三峡大学 水利与环境学院,湖北 宜昌 443002
  • 2. 中国葛洲坝集团 第一工程有限公司,湖北 宜昌 443000
  • 折叠

摘要

Abstract

To effectively control the construction progress of underground caverns and address the impact of multi-risk factor coupling on the construction schedule,this paper proposes a risk coupling analysis method integrating Social Network Analysis(SNA)and the N-K model.Firstly,risk factors are identified and a risk factor set is constructed using the Work Breakdown Structure-Risk Breakdown Structure(WBS-RBS)analysis method.Secondly,SNA is applied to build a risk association net-work model,clarifying the interaction mechanism between risk factors,revealing their potential coupling relationships,and analy-zing the importance of each node.Thirdly,based on the risk coupling mechanism,the N-K model is introduced to construct a risk coupling model for underground cavern construction progress,which quantifies the coupling strength under different coupling rela-tionships,calculates the coupling values for different coupling types,and uses these values to revise the node importance in the SNA.Finally,a risk factor coupling evaluation model integrating SNA and the N-K model is established.A case analysis is con-ducted taking the spillway tunnel construction of the Wudongde Hydropower Station as an example.The results show that the more risk factors involved in coupling,the larger the coupling value,and the more likely risk events are to occur.Among the 13 second-ary risk factors,adverse geological conditions,severe weather,design modification,and mutual interference in construction are the key risk factors leading to schedule delays in spillway tunnel construction,which is consistent with the actual situation at the con-struction site.

关键词

地下洞室施工进度/风险耦合/社会网络分析(SNA)/N-K模型/乌东德水电站

Key words

construction progress of underground caverns/risk coupling/Social Network Analysis(SNA)/N-K model/Wu-dongde Hydropower Station

分类

建筑与水利

引用本文复制引用

黄建文,黎雅君,王兴霞,王宇峰,张建军,覃新友..融合SNA和N-K的地下洞室施工进度风险耦合分析[J].人民长江,2026,57(6):197-204,251,9.

基金项目

国家自然科学基金项目(5209069,51879147) (5209069,51879147)

湖北省水电工程施工与管理重点实验室开放基金项目(2024KSD18) (2024KSD18)