| 注册
首页|期刊导航|石油钻采工艺|陕北特低渗储层注水井序列化复合解堵体系

陕北特低渗储层注水井序列化复合解堵体系

齐宏鹏 毛慧 夏宇 唐善法

石油钻采工艺2026,Vol.48Issue(3):370-377,8.
石油钻采工艺2026,Vol.48Issue(3):370-377,8.DOI:10.13639/j.odpt.202509001

陕北特低渗储层注水井序列化复合解堵体系

A study on a sequential composite plugging removal system for water injection wells in ultra-low permeability reservoirs,Northern Shaanxi

齐宏鹏 1毛慧 2夏宇 3唐善法3

作者信息

  • 1. 延长油田股份有限公司吴起采油厂,陕西 延安 716000
  • 2. 中国石油集团安全环保技术研究院有限公司,北京 102206
  • 3. 长江大学石油工程学院,湖北 武汉 430100
  • 折叠

摘要

Abstract

To address the challenge of a sudden surge in water injection pressure caused by composite plugging of inorganic scale deposition,microbial biofilms and organic substances in water injectors in ultra-low permeability reservoirs in northern Shaanxi,this study innovatively proposes a mild sequential composite plugging removal technology.Through multi-scale characterization such as XRD,FTIR,and SEM-EDS,the plugging material is identified as an organic-inorganic composite structure with a ratio of 1∶9,among which the polysaccharide-protein network of SRB(Sulfate-Reducing Bacteria)biofilms wraps around inorganic scales to form a dense barrier,resulting in the failure of conventional plugging removers.Based on this,a three-stage synergistic plugging removal system is constructed and its graded plugging removal mechanism is clarified.The first stage is biofilm breakdown:0.03%quaternary ammonium salt bactericide JY-1 and 0.4%-0.5%biofilm stripper(mass ratio of amylase to protease is 1∶1)is engaged,which breaks the physical barrier of biofilms through the enzymatic degradation of polysaccharide skeletons and protein matrices.The second stage is inorganic scale dissolution:3.0%EDTMP chelating agent,3%HCl,and 0.8%sodium citrate is engaged,which selectively dissolves CaCO3/FeS and inhibits secondary precipitation.The third stage is flowback assistance and formation damage prevention:0.4%fluorocarbon surfactant FT-1,1%isopropanol,and 0.5%imidazoline corrosion inhibitor ML-1 is engaged,which promotes the flowback of residues by reducing interfacial tension force,while the imidazoline forms an adsorption film on the pipe walls to inhibit corrosion.Laboratory-scale experiments show that this system achieves a dissolution rate of 92.3%,a corrosion rate of 0.047 mm/a,and both the anti-swelling rate and iron removal rate exceed 84%.This system is significantly superior to the traditional mud acid(45.2%)and chelating acid(65.1%)systems in terms of dissolution rate.In field tests,the water injection pressure decreased from 15 MPa to 2.0 MPa,with an effective period of more than 6 months.This technology solves the plugging challenges of water injectors in this oil area and provides an efficient and low-damage approach for the treatment of composite plugging in ultra-low permeability oilfields.

关键词

特低渗储层/注水井/复合堵塞/序列化解堵/生物膜剥离剂/螯合酸/解堵机理

Key words

ultra-low permeability reservoir/water injection well/composite plugging/sequential plugging removal/biofilm stripping agent/chelating acid/plugging removal mechanism

分类

能源科技

引用本文复制引用

齐宏鹏,毛慧,夏宇,唐善法..陕北特低渗储层注水井序列化复合解堵体系[J].石油钻采工艺,2026,48(3):370-377,8.

基金项目

延长油田股份有限公司新技术项目"油田精细注水配套工艺技术研究与试验"(编号:ycsy2023xjs-C-01). (编号:ycsy2023xjs-C-01)

石油钻采工艺

1000-7393

访问量0
|
下载量0
段落导航相关论文