首页|期刊导航|三峡大学学报(自然科学版)|特高面板堆石坝监测廊道应力变形精细化分析

特高面板堆石坝监测廊道应力变形精细化分析

黄文斌 胡继洲 黄青富 魏匡民 米占宽

三峡大学学报(自然科学版)2026,Vol.48Issue(4):25-32,8.
三峡大学学报(自然科学版)2026,Vol.48Issue(4):25-32,8.DOI:10.13393/j.cnki.issn.1672-948X.2026.04.004

特高面板堆石坝监测廊道应力变形精细化分析

Refined Analysis of Stress-Deformation in Monitoring Galleries of Extra-High Concrete-Faced Rockfill Dams

黄文斌 1胡继洲 2黄青富 3魏匡民 4米占宽4

作者信息

  • 1. 南京水利科学研究院岩土工程研究所,南京 210024
  • 2. 南京水科院瑞迪科技集团有限公司,南京 210000
  • 3. 中国电建集团 昆明勘测设计研究院有限公司,昆明 650051
  • 4. 南京水利科学研究院岩土工程研究所,南京 210024||水利部 水库大坝安全重点实验室,南京 210029
  • 折叠

摘要

Abstract

Concrete-faced rockfill dams(CFRDs)are currently undergoing a technological challenge involving an increase in height from the 200-meter level to the 250-meter level,which presents significant engineering challenges.Accurate monitoring of stress and deformation throughout the construction and operational stages is significant for ensuring the safe performance of such high CFRDs.Existing internal monitoring technologies face challenges such as monitoring range,environmental complexity,which in turn lead to a host of severe issues including poor durability of instruments,difficult maintenance,and abnormal data.The design of internal inspection galleries offers a promising solution to these issues.However,inspection galleries experience substantial overburden pressure and potential deformation incompatibility with the surrounding rockfill mass.The behavior of internal inspection galleries under high overburden pressures and potential deformation incompatibility is understudied.This study employs a refined finite element model to investigate the design of galleries within the GS extra-high CFRD.Our analysis focuses on the impact of joint design on structural performance,while also mapping the evolution of stress and deformation during the dam's entire lifecycle.The influence of different joint configurations on gallery structural behavior was systematically analyzed,and the stress-deformation evolution across all project phases was tracked in this study.Results indicate that the multi-point displacement constraint method effectively enables refined simulation of the gallery structure,overcoming computational difficulties arising from the large-scale discrepancy between gallery elements and dam elements.Joint width significantly influences the stress-deformation response of the gallery.Through comparative analysis of various joint width scenarios,an optimal joint width is recommended.Localized stresses in the gallery are found to exceed the permissible concrete strength in certain regions,where targeted reinforcement is recommended based on the calculation results.

关键词

面板堆石坝/监测廊道/精细化/有限元分析/应力变形

Key words

concrete-faced rockfill dams/inspection gallery/refined simulation/finite element analysis/stress and deformation

分类

建筑与水利

引用本文复制引用

黄文斌,胡继洲,黄青富,魏匡民,米占宽..特高面板堆石坝监测廊道应力变形精细化分析[J].三峡大学学报(自然科学版),2026,48(4):25-32,8.

基金项目

国家自然科学基金项目(52350393) (52350393)

西藏自治区"十四五"时期清洁能源科技重大专项(XZ202201ZD0003G) (XZ202201ZD0003G)

陕西省科技计划项目(2024GX-YBXM-470) (2024GX-YBXM-470)

中央级公益性科研院所基本科研业务费专项资金项目(Y325003) (Y325003)