| 注册
首页|期刊导航|现代交通技术|整体开发片区道路桥头沉降处理方案研究

整体开发片区道路桥头沉降处理方案研究

缪勤荣

现代交通技术2026,Vol.23Issue(2):7-12,6.
✕
现代交通技术2026,Vol.23Issue(2):7-12,6.

整体开发片区道路桥头沉降处理方案研究

Research on Treatment Schemes for Bridgehead Settlement of Roads in Integrated Developed Areas

缪勤荣1

作者信息

  • 1. 东华理工大学土木与建筑工程学院,南昌 330013||苏邑设计集团有限公司,南京 210012
  • 折叠

摘要

Abstract

Excessive differential settlement at road-bridge transition sections tends to cause hazards such as vehicle bump at bridgehead,road damage,underground pipeline damage and so on.Measures for subgrade settlement control mainly include lightweight filling method,preloading method,replacement cushion method and composite foundation method.In view of two typical saturated soft soil geological conditions in the southern and northern parts of Nanjing Jiangxinzhou Island,appropriate post construction settlement treatment schemes for filled road sections were proposed respectively.The research results show that on the basis of coordinating the overall project schedule in integrated developed areas,applying surcharge preloading to subgrade using spoil from regional development projects to control bridgehead settlement is technically feasible and economically advantages.

关键词

工后沉降/预压法/复合地基法/固结度

Key words

post construction settlement/preloading method/composite foundation method/degree of consolidation

分类

交通工程

引用本文复制引用

缪勤荣..整体开发片区道路桥头沉降处理方案研究[J].现代交通技术,2026,23(2):7-12,6.

现代交通技术

1672-9889

访问量0
|
下载量0
段落导航相关论文