摘要
Abstract
This paper takes the construction of a fractured rock mass high slope in a high-altitude project in Tibet as the background,and elaborates on the construction process and operation points in response to the difficulties faced by high-altitude areas such as rock mass falling,high safety risks,and ecological fragility.It includes key links such as construction preparation,setting out,slope cleaning and repair,cement slurry consolidation,self advancing anchor rod construction,machine woven active network laying,and shotcrete construction.It ultimately achieves construction safety,cost reduction and efficiency improvement,while providing technical reference for similar slope support projects in Tibetan areas,helping ecological protection and sustainable development.关键词
藏区/碎裂岩体/高边坡支护Key words
Tibetan area/fragmented rock mass/high slope support分类