| 注册
首页|期刊导航|重型机械|基于层级仿真的U型钢结构件生产线产能综合优化

基于层级仿真的U型钢结构件生产线产能综合优化

鞠振 黄勇 孟庆玉 于航南

重型机械Issue(3):63-69,7.
重型机械Issue(3):63-69,7.

基于层级仿真的U型钢结构件生产线产能综合优化

Comprehensive capacity optimization of U-shaped steel structure production line based on hierarchical simulation

鞠振 1黄勇 2孟庆玉 3于航南4

作者信息

  • 1. 新疆农业大学 机电工程学院,新疆 乌鲁木齐 830052
  • 2. 新疆农业大学 机电工程学院,新疆 乌鲁木齐 830052||新疆天福泰钢结构有限公司,新疆 乌鲁木齐 830063
  • 3. 新疆天福泰钢结构有限公司,新疆 乌鲁木齐 830063
  • 4. 建筑钢结构智能制造兵团重点实验室,新疆 乌鲁木齐 830063
  • 折叠

摘要

Abstract

To address the capacity shortage caused by imbalanced processing times between workstations in a U-shaped steel structure production line,this paper proposes a Plant Simulation-based optimization method.A digital model of the production line is built,and the optimal buffer capacities,along with the optimal number of workstations for bottleneck processes(electroslag welding and shot blasting),are determined based on this model.A"hierarchical simulation"scheme is developed to reduce the number of simulation runs under multi-parameter combinations by progressively narrowing the search range and increasing precision.The resulting optimal configuration increases simulated capacity by 38.32%,raising weekly output from 3 212 to 4 443 units.This work provides a reference for capacity optimization of similar production lines.

关键词

Plant Simulation/U型钢结构件/产能优化/层级仿真

Key words

Plant Simulation/U-shaped steel structural component/capacity optimization/hierarchical simulation

分类

机械制造

引用本文复制引用

鞠振,黄勇,孟庆玉,于航南..基于层级仿真的U型钢结构件生产线产能综合优化[J].重型机械,2026,(3):63-69,7.

重型机械

1001-196X

访问量0
|
下载量0
段落导航相关论文