泥沙研究2026,Vol.51Issue(3):71-78,8.DOI:10.16239/j.cnki.0468-155x.2026.03.010
沙区铁路沿线PE网与芦苇沙障组合防沙功效实验研究
Experimental study on the sand control effectiveness of combined PE net and reed barriers along railways in sandy areas
摘要
Abstract
Wind-sand hazards are one of the primary threats to the safe operation of railways in sandy regions.To evaluate the sand control performance of different sand barrier combinations,this study systematically ana-lyzes the wind reduction and sand control effects of various layouts of PE net and reed barrier through wind tunnel experiments and numerical simulations.Results show that a single row of reed barrier can reduce wind speed by up to 45%,significantly outperforming the 32%reduction achieved by a single row of PE net.A double row of reed barrier forms a stable low-velocity zone between the structures,with wind speed reduction exceeding 60%,demonstrating better wind control than double PE net.Among combined barriers,the"flexi-ble front and rigid rear"configuration(PE net-reed)exhibits the best sand control performance,the total sand transport rate is about one-third of that with the single PE net.Under high wind speeds,this configuration maintains effective wind reduction and sand deposition regulation,forming a multi-stage protection mechanism of disturbance-deposition-stabilization.It offers a promising approach for enhancing wind-sand hazard control in railway systems across sandy regions.关键词
铁路/风沙/PE网沙障/芦苇沙障/防沙功效Key words
railway/wind-blown sand/PE net sand barrier/reed sand barrier/sand control effectiveness分类
交通工程引用本文复制引用
渠继民,苗丰满,曲范乾..沙区铁路沿线PE网与芦苇沙障组合防沙功效实验研究[J].泥沙研究,2026,51(3):71-78,8.基金项目
甘肃省住房和城乡建设厅建设科技项目(JK2024-40) (JK2024-40)