| 注册
首页|期刊导航|西南石油大学学报(自然科学版)|冀东X油藏型储气库建库及提高原油采收率方案优化研究

冀东X油藏型储气库建库及提高原油采收率方案优化研究

何海燕 刘伟 乔宇 罗豫龙 田新民 田中敬

西南石油大学学报(自然科学版)2026,Vol.48Issue(4):94-112,19.
✕
西南石油大学学报(自然科学版)2026,Vol.48Issue(4):94-112,19.DOI:10.11885/j.issn.1674-5086.2025.12.23.02

冀东X油藏型储气库建库及提高原油采收率方案优化研究

Optimizing Schemes of EOR and Underground Gas Storage Based on Jidong X Oil Reservoirs

何海燕 1刘伟 1乔宇 1罗豫龙 2田新民 1田中敬1

作者信息

  • 1. 中国石油冀东油田分公司,河北 唐山 063004
  • 2. 油气藏地质及开发工程全国重点实验室·西南石油大学,四川 成都 610500
  • 折叠

摘要

Abstract

Underground gas storage(UGS)facilities in China are predominantly developed in gas reservoirs,exhibiting lim-ited diversity,while UGS conversion from depleted oil reservoirs remains in its nascent stage.To address key challenges such as complex post-waterflood fluid distribution,intricate seepage mechanisms,and undefined technical policies for synergistic development,this study focuses on the X Oil Reservoir in the Jidong Oilfield.A comprehensive investigation was conducted to optimize collaborative hydrocarbon recovery enhancement and storage capacity expansion.By integrating high-resolution geological characterization,dynamic evaluation of individual well injectivity/productivity,and optimal well pattern selection,a numerical simulation model was established.Quantitative analyses were performed to evaluate the impacts of full-cycle liquid drainage,timing of transitioning to areal flooding,and staged pressure ramp-up on storage capacity utilization and oil recovery.The results are as follows:1)Full-cycle liquid drainage significantly enhances drainage rates and working gas volume compared to conventional methods;2)The optimal transition to areal flooding occurs when the gas front reaches the structural low,effec-tively mitigating gas breakthrough risks while accelerating working gas formation;3)A"staged and stepwise pressure ramp-up"strategy is proposed,with the initial pressure increase timed at the shift from single-pattern gas drive to areal flooding,enabling synchronous growth in both storage capacity and drained liquids.Simulation forecasts indicate that the"full-cycle drainage+pressure ramp-up"mode will achieve the target working gas volume of 10.52×108 m3 by 2034-2035,maximizing both storage space and recovery efficiency.These results provide critical technical foundations for realizing the"high deliverability with fewer wells and efficient UGS development"objective in similar depleted oil reservoir conversions.

关键词

油藏协同建库/提采扩容/井网优化/注采方案优化/数值模拟

Key words

collaborative construction of reservoir-type UGS/EOR and capacity expansion/well pattern optimization/injection-production scheme optimization/numerical simulation

分类

能源科技

引用本文复制引用

何海燕,刘伟,乔宇,罗豫龙,田新民,田中敬..冀东X油藏型储气库建库及提高原油采收率方案优化研究[J].西南石油大学学报(自然科学版),2026,48(4):94-112,19.

西南石油大学学报(自然科学版)

1674-5086

访问量0
|
下载量0
段落导航相关论文