| 注册
首页|期刊导航|云南水力发电|基于Excel VBA的暴雨点面时化算系数插值计算

基于Excel VBA的暴雨点面时化算系数插值计算

陈莎莎 张丰丽

云南水力发电2026,Vol.42Issue(7):14-20,7.
✕
云南水力发电2026,Vol.42Issue(7):14-20,7.DOI:10.3969/j.issn.1006-3951.2026.07.004

基于Excel VBA的暴雨点面时化算系数插值计算

Interpolation Calculation of Rainstorm Point Surface Time Chemical Calculation Coefficient Based on Excel VBA

陈莎莎 1张丰丽1

作者信息

  • 1. 长江水利水电开发集团(湖北)有限公司,湖北 武汉 430014
  • 折叠

摘要

Abstract

In hydraulic engineering,it is common to encounter design parameters that are controlled by three factor variables:a categorical variable and two continuous data variables.Key interpolation points need to be determined by looking up a table and calculated using bilinear interpolation.In response to this issue,this paper used VBA for secondary development of Excel,and customized a function program using Excel VBA.The program can automatically determine the key interpolation points of design parameters based on the values of three factor variables,and complete the interpolation calculation of coefficients on this basis,achieving batch calculation of design parameters.The method is applied to batch solution of rainstorm point surface time chemical calculation coefficient in a river regulation project in Yunnan Province.The results show that the method solves the problem that the traditional manual table lookup is easy to make mistakes in solving the chemical calculation coefficient,and greatly improves the work efficiency.

关键词

Excel VBA/三因素变量/二次开发/关键插值点/双线性插值

Key words

Excel VBA/three variable factors/secondary development/key interpolation point/bilinear interpolation

分类

信息技术与安全科学

引用本文复制引用

陈莎莎,张丰丽..基于Excel VBA的暴雨点面时化算系数插值计算[J].云南水力发电,2026,42(7):14-20,7.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文