榕江关埠引水工程水力过渡过程研究

甘大钦

广东水利水电Issue(8):72-78,7.
✕
广东水利水电Issue(8):72-78,7.

榕江关埠引水工程水力过渡过程研究

Study on the Hydraulic Transition Process of the Rongjiang Ganbu Water Diversion Project

甘大钦1

作者信息

  • 1. 广东省粤东三江连通建设有限公司,广州 510000
  • 折叠

摘要

Abstract

Through one-dimensional numerical simulations,this study investigates the hydraulic transition process of the Rongjiang Guanbu Water Diversion Project.It analyzes how the closing pattern of the post-pump valve affects both pump speed and downstream pressure.The research demonstrates that a combined evaluation of the valve's closing mechanism and operational parameters is essential to determine the optimal closing pattern.Compared to conventional post-pump pressure regulation chambers,installing impedance-based pressure regulation chambers along the pipeline demonstrates superior water hammer protection.This configuration effectively prevents chamber leakage and negative pressure formation in pipelines,while avoiding liquid column separation.These findings provide practical guidance for similar water conveyance projects.

关键词

长距离输水/一维数值模拟/调压室/水锤计算/榕江关埠引水工程

Key words

long distance water conveyance/one-dimensional numerical simulation/pressure regulating chamber/water hammer calculation/Rongjiang Guanbu Water Diversion Project

分类

建筑与水利

引用本文复制引用

甘大钦..榕江关埠引水工程水力过渡过程研究[J].广东水利水电,2026,(8):72-78,7.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文