广东水利水电Issue(8):134-138,5.
抽水蓄能电站导叶关闭规律与尾水调压室阻抗孔尺寸优化研究
Optimization of Guide Vane Closing Law and Tailrace Surge Chamber Impedance Orifice Size in a Pumped Storage Power Station
摘要
Abstract
This study investigates a pumped storage power station in Guangdong Province,China,focusing on optimizing hydraulic transient processes in the water conveyance and generating system.By establishing a numerical model for hydraulic transients,the effects of guide vane closing laws and impedance orifice size in the tailrace surge chamber are systematically analyzed.The results indicate that:For turbine operating conditions,guide vane closing duration significantly influences hydraulic transient guarantee design parameters,and selecting an appropriate closing time can optimize extreme transient values.Besides,increasing the orifice diameter in the tailrace surge chamber outperforms adjustments to tailrace pipe diameter,gate location,or surge chamber location,by significantly improving minimum draft tube inlet pressure and transient process quality.This study provides theoretical and practical insights for designing and operating pumped storage power systems.关键词
抽水蓄能电站/导叶关闭规律/尾水调压室阻抗孔/水力过渡过程/尾水管进口最小压力Key words
pumped storage power station/guide vane closing law/tailrace surge chamber impedance orifice/hydraulic transient processes/minimum draft tube inlet pressure分类
建筑与水利引用本文复制引用
张国罡,王婧,任灏,张绍欣..抽水蓄能电站导叶关闭规律与尾水调压室阻抗孔尺寸优化研究[J].广东水利水电,2026,(8):134-138,5.基金项目
中国能建广东院科技项目(编号:EV11021W). (编号:EV11021W)