广东水利水电Issue(8):139-146,8.
涉河建设项目批后核查揭示的问题与对策研究
Practical Issues and Countermeasures in Post-approval Inspection of Flood Control Evaluations for River-Related Construction Projects:
史树洁 1崔国韬 2安娟1
作者信息
- 1. 广东河海工程咨询有限公司,广州 510610
- 2. 中山大学 地理科学与规划学院,广州 510275
- 折叠
摘要
Abstract
River-related construction projects,while supporting socio-economic development,also impose higher requirements on water management.Effective post-approval supervision of such projects is fundamental to ensuring flood control safety.Using a district in Guangdong Province as a case study,this paper conducts on-site inspections of 32 approved projects and identifies several issues,including inconsistencies between construction practices and approved plans,arbitrary placement of temporary facilities,and inadequate flood-season preparedness measures.The underlying causes are mainly the disconnection between project design and implementation,insufficient enforcement of construction management responsibilities,and deficiencies in the supervision mechanism.To address these challenges,this study proposes countermeasures such as strengthening plan implementation,standardizing temporary facility management,and improving flood control and flood-season preparedness.These measures aim to enhance construction safety and regional flood control and drainage capacity.The findings provide practical references for optimizing post-approval supervision mechanisms for river-related construction projects and improving basin-wide flood safety management.关键词
涉河建设项目/防洪安全/监管/对策Key words
river-related construction projects/flood control safety/supervision/countermeasures分类
建筑与水利引用本文复制引用
史树洁,崔国韬,安娟..涉河建设项目批后核查揭示的问题与对策研究[J].广东水利水电,2026,(8):139-146,8.