| 注册
首页|期刊导航|自动化学报(英文版)|A Two-Step Iterative Local Search for the Harvester Scheduling Problem With Splittable Workloads

A Two-Step Iterative Local Search for the Harvester Scheduling Problem With Splittable Workloads

Hongyu Lin Jing Liang Bo Jin Caitong Yue Yaonan Wang

自动化学报(英文版)2026,Vol.13Issue(7):1584-1599,16.
自动化学报(英文版)2026,Vol.13Issue(7):1584-1599,16.DOI:10.1109/JAS.2025.125768

A Two-Step Iterative Local Search for the Harvester Scheduling Problem With Splittable Workloads

A Two-Step Iterative Local Search for the Harvester Scheduling Problem With Splittable Workloads

Hongyu Lin 1Jing Liang 2Bo Jin 3Caitong Yue 1Yaonan Wang4

作者信息

  • 1. School of Electrical and Information Engineering,Zhengzhou University,Zhengzhou 450001,China
  • 2. School of Electrical and Information Engineering,Zhengzhou University,Zhengzhou 450001||School of Electrical Engineering and Automation,Henan Institute of Technology,Xinxiang 453003,China
  • 3. College of Management,Shenzhen University,Shenzhen 518055,China
  • 4. College of Electrical and Information Engineering,Hunan University,Changsha 410082||National Engineering Research Center for Robot Visual Perception and Control Technology,Hunan University,Changsha 410082,China
  • 折叠

摘要

关键词

Cooperative operations/heuristic/local search/multi-harvester scheduling

Key words

Cooperative operations/heuristic/local search/multi-harvester scheduling

引用本文复制引用

Hongyu Lin,Jing Liang,Bo Jin,Caitong Yue,Yaonan Wang..A Two-Step Iterative Local Search for the Harvester Scheduling Problem With Splittable Workloads[J].自动化学报(英文版),2026,13(7):1584-1599,16.

基金项目

This work was supported in part by the National Natural Science Foundation of China(62106230,U23A20340,62376253,62176238),China Postdoctoral Science Foundation(2023M743185),and Henan Provincial Natural Science Foundation Project(242300420277). (62106230,U23A20340,62376253,62176238)

自动化学报(英文版)

2329-9266

访问量0
|
下载量0
段落导航相关论文