| 注册
首页|期刊导航|四川水力发电|某狭长深凹陷露天矿山排水方案优化研究

某狭长深凹陷露天矿山排水方案优化研究

陈前 许昊 廖祥童 邵志敏

四川水力发电2026,Vol.45Issue(z1):116-119,4.
✕
四川水力发电2026,Vol.45Issue(z1):116-119,4.DOI:10.20196/j.cnki.scslfd.2026S123

某狭长深凹陷露天矿山排水方案优化研究

Optimization of drainage schemes for narrow and deep depression open-pit mines

陈前 1许昊 1廖祥童 1邵志敏1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川 成都 610037
  • 折叠

摘要

Abstract

Drainage challenges in narrow and deep depression open-pit mines are often exacerbated by complex geological structures and high-frequency precipitation,particularly during tropical rainy seasons.This study ad-dresses the specific drainage requirements of the Segilola Gold Mine in Nigeria,proposing a comprehensive op-timized drainage solution.By enhancing the technical level of pumping drainage systems,improving methods for groundwater inflow control,and implementing automated drainage management technologies,the study achieves a systematic resolution of drainage issues.The implementation of this optimized scheme not only en-sures mine production safety but also significantly improves operational economic efficiency,while providing valuable reference for similar mining projects.

关键词

尼日利亚塞吉罗拉金矿/深凹陷露天矿山/排水系统优化/地下水涌水处理/自动化排水控制

Key words

Segilola Gold Mine/nigeria/open-pitmine with deep depression/drainage system optimization/groundwater inflow control/automated drainage management

分类

矿业与冶金

引用本文复制引用

陈前,许昊,廖祥童,邵志敏..某狭长深凹陷露天矿山排水方案优化研究[J].四川水力发电,2026,45(z1):116-119,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文