四川水力发电2026,Vol.45Issue(4):125-130,6.DOI:10.20196/j.cnki.scslfd.20260426
硬梁包水电站电气一次设计
Primary electrical design of Yingliangbao Hydropower Station
钟沛 1于青坤 2陈九林 3李超凡 1屈柏林1
作者信息
- 1. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
- 2. 四川华能涪江水电有限责任公司,四川 绵阳 628000
- 3. 四川华能泸定水电有限公司,四川 泸定 626100
- 折叠
摘要
Abstract
Yingliangbao Hydropower Station with a typical long-diversion layout,is a key 13th Five-Year Plan project.This paper presents its primary electrical design,including grid connection,main electrical wiring,aux-iliary power,major electrical equipment,grounding and lighting.New technologies and materials such as three-phase integrated shunt reactor and basalt-fiber cable trays are used.Operational results show that the scheme is safe and stable,which provides references of the green and low-carbon construction for similar projects.关键词
长引水式水电站/电气一次设计/三相一体电抗器/玄武岩纤维桥架Key words
long diversion-type hydropower station/primary electrical design/three-phase shunt integrated reac-tor/basalt fiber cable tray分类
农业科技引用本文复制引用
钟沛,于青坤,陈九林,李超凡,屈柏林..硬梁包水电站电气一次设计[J].四川水力发电,2026,45(4):125-130,6.