运营地铁高架车站改扩建不停运施工与沉降控制技术

谢渭平

市政技术2026,Vol.44Issue(8):160-167,182,9.
✕
市政技术2026,Vol.44Issue(8):160-167,182,9.DOI:10.19922/j.1009-7767.2026.08.160

运营地铁高架车站改扩建不停运施工与沉降控制技术

Construction Without Service Interruption and Settlement Control Techniques for Expansion and Renovation of Operating Elevated Metro Stations

谢渭平1

作者信息

  • 1. 中国水利水电第八工程局有限公司,湖南长沙 410004
  • 折叠

摘要

Abstract

Early-built elevated metro stations often require expansion and renovation due to increasing passenger flow,while maintaining uninterrupted operation poses significant challenges.The core difficulties lie in construction organization and controlling differential settlement between new and existing structures.Taking the expansion pro-ject of Maqun Station on Nanjing Metro Line 2 as a case study,this paper presents practical solutions including op-timized zoned flow construction organization,three-dimensional simulation for settlement prediction,and dynamic monitoring with closed-loop control.These measures successfully achieved non-stop construction,ensured safety throughout the construction process,and maintained normal operation of the existing line.The station's newly added floor area reaches 7 735 m2,significantly enhancing its service capacity.The research outcomes are highly applicable engineering techniques that can be directly implemented in similar expansion and renovation projects of operating elevated metro stations.

关键词

运营地铁/高架车站/改扩建/不停运施工/数值模拟

Key words

operating metro/elevated station/expansion and renovation/construction without service interruption/numerical simulation