| 注册
首页|期刊导航|北京水务|潮白河通州段防洪安全评价与治理措施研究

潮白河通州段防洪安全评价与治理措施研究

韩殿微

北京水务Issue(4):15-19,5.
✕
北京水务Issue(4):15-19,5.DOI:10.19671/j.1673-4637.2025171

潮白河通州段防洪安全评价与治理措施研究

Study on flood control safety evaluation and governance measures in the Tongzhou section of the Chaobai River

韩殿微1

作者信息

  • 1. 北京市潮白河管理处 北京 101300
  • 折叠

摘要

Abstract

The Tongzhou section of the Chaobai River faced prominent weaknesses in flood control safety,including a low dike compliance rate,insufficient flood discharge capacity,and adverse riverbed topography that impeded flood conveyance.In this study,the two-dimensional hydrodynamic model HEC-RAS was adopted for flood simulation and calculation.Combined with the current river channel conditions and planning requirements,a flood control safety evaluation was conducted,and specific governance measures were proposed.The results showed that after implementing measures such as raising and thickening dikes,optimizing river configuration,and applying graded protection,the right dike in the Urban Subcenter section met the 100-year return period flood control standard,while the other sections met the 50-year return period standard.The dike compliance rate of the Tongzhou section was increased to 100%,and the river channel discharge capacity met the designed flood peak discharge requirement of 3000-3660 m3/s.These findings provide valuable technical references and practical engineering experience for improving the flood control safety of river channels.

关键词

潮白河/防洪治理/堤防工程/行洪能力/HEC-RAS模型

Key words

Chaobai River/flood control governance/dike engineering/flood discharge capacity/HEC-RAS model

分类

建筑与水利

引用本文复制引用

韩殿微..潮白河通州段防洪安全评价与治理措施研究[J].北京水务,2026,(4):15-19,5.

北京水务

1673-4637

访问量0
|
下载量0
段落导航相关论文