| 注册
首页|期刊导航|东南大学学报(自然科学版)|山地风电场水平外推不确定度计算方法的适应性研究

山地风电场水平外推不确定度计算方法的适应性研究

彭留留 蔡思雯 刘瑞莉 杨庆山 韦关祥 黄国庆 姜言

东南大学学报(自然科学版)2026,Vol.56Issue(9):1271-1278,8.
✕
东南大学学报(自然科学版)2026,Vol.56Issue(9):1271-1278,8.DOI:10.3969/j.issn.1001-0505.2026.09.005

山地风电场水平外推不确定度计算方法的适应性研究

Adaptability of uncertainty calculation methods for horizontal extrapolation in mountainous wind farms

彭留留 1蔡思雯 2刘瑞莉 1杨庆山 1韦关祥 3黄国庆 1姜言4

作者信息

  • 1. 重庆大学土木工程学院,重庆 400045
  • 2. 中国电建集团成都勘测设计研究院有限公司,成都 611130
  • 3. 中信重工机械股份有限公司,洛阳 471039
  • 4. 重庆交通大学山区桥梁及隧道工程国家重点实验室,重庆 400074
  • 折叠

摘要

Abstract

The quantification of horizontal extrapolation uncertainty is crucial for wind resource assessment in mountainous wind farms.However,the applicability of the two commonly used quantification methods—the one based on horizontal distance and terrain acceleration ratio,and the other one based on spatial extrapolation distance and other comprehensive influencing factors—remains unclear under such terrain conditions.There-fore,this study evaluated the adaptability of these horizontal extrapolation uncertainty calculation methods in mountainous wind farms using measured data from 16 meteorological towers in mountainous areas.First,the two methods were described in detail.Then,horizontal extrapolation uncertainty under various operational conditions in mountainous wind farms was quantified using these approaches.The calculated extrapolation un-certainties were compared with the target uncertainties calculated by Meteodyn WT to assess the applicability of each method.The research findings indicate that the method based on horizontal distance and terrain accel-eration ratio is significantly influenced by the terrain acceleration ratio and tends to underestimate the uncer-tainty of horizontal extrapolation.Therefore,it is recommended to avoid its application in complex terrains.In contrast,the method based on spatial extrapolation distance and other comprehensive influencing factors is notably affected by vertical distance,demonstrating good applicability in mountainous wind farms with verti-cal distances ranging from 60 to 300 m.

关键词

山地风电场/风资源评估/水平外推/不确定性/适应性研究

Key words

mountainous wind farms/wind resource assessment/horizontal extrapolation/uncertainty/adaptability study

分类

能源科技

引用本文复制引用

彭留留,蔡思雯,刘瑞莉,杨庆山,韦关祥,黄国庆,姜言..山地风电场水平外推不确定度计算方法的适应性研究[J].东南大学学报(自然科学版),2026,56(9):1271-1278,8.

基金项目

国家自然科学基金区域创新发展联合基金资助项目(U24A20174) (U24A20174)

重庆市自然科学基金创新发展联合基金资助项目(CSTB2024NSCQ-LZX0010) (CSTB2024NSCQ-LZX0010)

学科创新引智基地资助项目(B18062) (B18062)

国家自然科学基金面上资助项目(52378480,52578555) (52378480,52578555)

重庆市教委资助项目(KJZD-M202300201). (KJZD-M202300201)

东南大学学报(自然科学版)

1001-0505

访问量0
|
下载量0
段落导航相关论文