综采工作面末采阶段顶板切顶卸压技术应用
Application of Roof Cutting and Pressure Relief Technology in Final Mining Stage of Fully Mechanized Mining Face
杨俊杰1
作者信息
- 1. 晋能控股太原煤气化华苑煤业,山西 晋中 031300
- 折叠
摘要
Abstract
Aiming at the problem of severe mine pressure behavior caused by the high-strength K2 limestone layer in the working face,a roof presplitting blasting and roof cutting and pressure relief technology is proposed.By forming a weak structural surface in the rock strata to reduce mine pressure impact,optimize parameters such as vertical height,inclination angles,spacings and others of blastholes,deep hole energy gathering blasting technique and water cannon mud hole sealing technology are adopted to achieve precise release of blasting energy and construct a continuous penetration presplitting surface.The on-site application shows that the roof stability is significantly improved,the dynamic load coefficient of mine pressure and the working resistance of the bracket are reduced,the peak value of mine pressure is obviously decreased,and the operational safety is greatly improved.关键词
综采/顶板/预裂/爆破Key words
fully mechanized mining/roof/presplitting/blasting分类
矿业与冶金引用本文复制引用
杨俊杰..综采工作面末采阶段顶板切顶卸压技术应用[J].山东煤炭科技,2026,44(8):12-15,4.