基于TOC-6S模型的建筑施工进度优化研究

蒙展瑞

土木工程与管理学报2026,Vol.43Issue(4):63-70,8.
✕
土木工程与管理学报2026,Vol.43Issue(4):63-70,8.DOI:10.13579/j.cnki.2095-0985.2026.20250430

基于TOC-6S模型的建筑施工进度优化研究

Research on Construction Schedule Optimization Based on the TOC-6S Model

蒙展瑞1

作者信息

  • 1. 贵州大学 机械工程学院,贵州 贵阳 550025
  • 折叠

摘要

Abstract

Effective construction schedule management is essential throughout the project lifecycle.It reduces hidden costs such as work stoppages,rushed work,and delays due to material shortages,while also enhancing corporate reputation and market competitiveness.To address schedule delays,this study used the Guangdong H redevelopment project as a case study.This paper analyzed dynamic control records and historical data to identify key factors affecting progress.The TOC-6S model was in-troduced to identify bottlenecks and optimize construction workflows,which improved efficiency and enabled dynamic,controllable schedule management.The results show that this approach not only re-solves schedule management challenges but also deliveres significant benefits in cost savings,quality assurance,and safety.The study provides a theoretical basis and practical pathway for shifting the construction industry from experience-driven practices to precision bottleneck management,thereby improving overall resource utilization.

关键词

建筑施工/约束理论/进度优化/TOC-6S模型

Key words

building construction/theory of constraints/schedule optimization/TOC-6S model

分类

建筑与水利

引用本文复制引用

蒙展瑞..基于TOC-6S模型的建筑施工进度优化研究[J].土木工程与管理学报,2026,43(4):63-70,8.