Solving the railway timetable rescheduling problem with graph neural networks
Solving the railway timetable rescheduling problem with graph neural networks
摘要
关键词
Timetable rescheduling/Timetable rescheduling actions/Graph neural networks/Evaluation graphsKey words
Timetable rescheduling/Timetable rescheduling actions/Graph neural networks/Evaluation graphs引用本文复制引用
Ping Huang,Zihuan Peng,Zhongcan Li,Qiyuan Peng..Solving the railway timetable rescheduling problem with graph neural networks[J].铁道工程科学(英文),2026,34(3):385-406,22.基金项目
This work was supported by the National Nature Science Foundation of China(Grant numbers:72301221 and 72401158),the National Key Research and Development Program of China(Grant number:2022YFB4300502),and the China Postdoctoral Science Foundation(Grant number:2023M741956). (Grant numbers:72301221 and 72401158)